Final report on Technical Demonstration and Economic Validation of Geothermally-Produced Electricity from Coproduced Water at Existing Oil/Gas Wells in Texas
Abstract
The initial geothermal brine flow rate and temperature from the re-worked well were insufficient, after 2.5 days of flow testing, to justify advancing past Phase I of this project. The flow test was terminated less than 4 hours from the Phase I deadline for activity, and as such, additional flow tests of 2+ months may be undertaken in the future, without government support.
- Authors:
-
- Universal GeoPower LLC, Houston, TX (United States)
- Publication Date:
- Research Org.:
- Universal GeoPower LLC, Houston, TX (United States)
- Sponsoring Org.:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Geothermal Technologies Office
- OSTI Identifier:
- 1208636
- Report Number(s):
- Final 1.1
- DOE Contract Number:
- EE0002853
- Resource Type:
- Technical Report
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 15 GEOTHERMAL ENERGY; Co-produced geothermal brine
Citation Formats
Luchini, Chris B. Final report on Technical Demonstration and Economic Validation of Geothermally-Produced Electricity from Coproduced Water at Existing Oil/Gas Wells in Texas. United States: N. p., 2015.
Web. doi:10.2172/1208636.
Luchini, Chris B. Final report on Technical Demonstration and Economic Validation of Geothermally-Produced Electricity from Coproduced Water at Existing Oil/Gas Wells in Texas. United States. https://doi.org/10.2172/1208636
Luchini, Chris B. 2015.
"Final report on Technical Demonstration and Economic Validation of Geothermally-Produced Electricity from Coproduced Water at Existing Oil/Gas Wells in Texas". United States. https://doi.org/10.2172/1208636. https://www.osti.gov/servlets/purl/1208636.
@article{osti_1208636,
title = {Final report on Technical Demonstration and Economic Validation of Geothermally-Produced Electricity from Coproduced Water at Existing Oil/Gas Wells in Texas},
author = {Luchini, Chris B.},
abstractNote = {The initial geothermal brine flow rate and temperature from the re-worked well were insufficient, after 2.5 days of flow testing, to justify advancing past Phase I of this project. The flow test was terminated less than 4 hours from the Phase I deadline for activity, and as such, additional flow tests of 2+ months may be undertaken in the future, without government support.},
doi = {10.2172/1208636},
url = {https://www.osti.gov/biblio/1208636},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Jun 01 00:00:00 EDT 2015},
month = {Mon Jun 01 00:00:00 EDT 2015}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.