skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Building 594 waste ion exchange facility final survey report.

Technical Report ·
DOI:https://doi.org/10.2172/12054· OSTI ID:12054

The Waste Ion Exchange Facility was free released for demolition on July 30, 1998. No surprises or unknowns were noted. The building and associated piping were demolished and removed in September, 1998. The north drain line was removed to three feet outside of the foundation of the building. The east drain line was removed to the foundation of Building 593. The piping located in the north pit drain and east pit drain (which were located under the concrete) were free released. The catch basin, which was located on the south side of the building and also connected to equalization tanks in building 592, was released for unrestricted use and was left intact.

Research Organization:
Argonne National Lab., IL (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
W-31109-ENG-38
OSTI ID:
12054
Report Number(s):
ANL/ESH-HP-98/03; TRN: US0102337
Resource Relation:
Other Information: PBD: 18 Nov 1998
Country of Publication:
United States
Language:
English