skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Streamlining Analysis Capabilities for SNF Management

 [1];  [1];  [1];  [1];  [1]
  1. ORNL
Publication Date:
Research Org.:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Sponsoring Org.:
USDOE Office of Nuclear Energy (NE)
OSTI Identifier:
DOE Contract Number:
Resource Type:
Resource Relation:
Conference: WM2015, Phoenix, AZ, USA, 20150315, 20150319
Country of Publication:
United States

Citation Formats

Banerjee, Kaushik, Scaglione, John M, Lefebvre, Robert A, Radulescu, Georgeta, and Robb, Kevin R. Streamlining Analysis Capabilities for SNF Management. United States: N. p., 2015. Web.
Banerjee, Kaushik, Scaglione, John M, Lefebvre, Robert A, Radulescu, Georgeta, & Robb, Kevin R. Streamlining Analysis Capabilities for SNF Management. United States.
Banerjee, Kaushik, Scaglione, John M, Lefebvre, Robert A, Radulescu, Georgeta, and Robb, Kevin R. 2015. "Streamlining Analysis Capabilities for SNF Management". United States. doi:.
title = {Streamlining Analysis Capabilities for SNF Management},
author = {Banerjee, Kaushik and Scaglione, John M and Lefebvre, Robert A and Radulescu, Georgeta and Robb, Kevin R},
abstractNote = {},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = 2015,
month = 1

Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share:
  • This paper provides a comprehensive perspective on the scope of Environmental Management (EM) activities and on the existing capability to estimate their costs. The scope is defined in terms of both activities and associated cost driving factors. The capability to estimate this scope was determined by evaluating existing cost estimating tools identified through a survey of the US Department of Energy (DOE), the US Department of Defense (DoD), the US Environmental Protection Agency, and private industry. This paper is largely based on the results of a report produced for the Office of the Secretary of Defense, US Department of Defense,more » entitled, Evaluation of Environmental Management Cost-Estimating Capabilities of Major Defense Acquisition Programs, March 22, 1995. The DoD sponsored report was designed to have a broad application relevant not only to DoD, but to other government agencies, and industry. In addition to DoD, it has particular application to DOE because significant portions of the analyses and data were derived from DOE environmental management databases, cost models, reports, and work breakdown structures. This paper provides the basis used and methodology employed to conduct an evaluations of selected EM cost estimating tools. The following topics are discussed: Life Cycle of EM Activities; Major Elements of EM Activities; Cost Tool Evaluation Matrix; Results of Cost Tool Evaluations; Cost Tool Development Plan.« less
  • The energy management systems industry has come through its educational phase. Much trial and error, straddling of traditional roles among contractors, and blurring of roles of consulting engineers were experienced. It has been discovered that load-shedding is not the answer. To conserve energy does not mean to be cold in the winter and hot in the summer. By orchestrating air conditioning supply, and controlling rate of loss, the discomfort of load shedding is avoided. Outside dampers can also be opened early in the morning to pre-cool the zone and get a ''leg-up'' on the control. A successful example of thismore » method is shown. General criteria are listed.« less
  • Computerized Energy Management Systems (EMSs) are being installed in an increasing number of new and existing commercial buildings. While their primary function is to control building systems to save energy and power, many of these systems are also capable of monitoring the building systems and energy use. Using a case study approach, this paper evaluates the monitoring capabilities of the EMSs in two buildings in California. The retrieved data include historical hourly demand and outdoor air temperature, along with either instantaneous status or accumulated run-time data for each end use. The authors founds that an EMS, in order to monitormore » building energy performance, must reliably measure parameters that yield energy consumption information (end-use demand is most useful) and store this information long enough so that it can be retrieved. In many cases, minor additions to the hardware and software of an EMS could greatly enhance its monitoring capabilities.« less
  • The Konsolen building is a high thermal mass 57-unit apartment building on the outskirts of Stockholm, Sweden. It is part of the Stockholm Project, a full-scale demonstration of energy-saving techniques. A large number of sensors were installed in the building for research purposes. However, they may not be needed for some types of analysis. It is of interest to see what could be learned if only typical Energy Management Systems (EMS) outputs were available. These include total electricity use, heat output from the heat pump, and heat supplied by the district heating main. It was found that the detailed sensorsmore » were essential in debugging the mechanical systems initially, but the EMS-type outputs are quite adequate to confirm that the building continues to operate normally. The building has such stable lumped parameters (average temperature, base load and thermal resistance) that detailed data are not needed to predict the average daily heat demand to within +-10%. However, neither the effect of the solar collectors nor the thermal mass of the building are visible in the EMS-type data. 3 refs., 4 figs., 1 tab.« less
  • This paper addresses the plans and strategies for remediation of the Liquid Low-Level Waste (LLLW) system tanks that have been removed from service at the Oak Ridge National Laboratory (ORNL). The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facility Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the U.S. Department of Energy Oak Ridge Operations Office (DOE-ORO), the EPA-Region IV, and the Tennessee Departmentmore » of Environment and Conservation (TDEC). The effective date of the FFA is January 1, 1992. One requirement of the FFA is that LLLW tanks that are removed from service must be evaluated and remediated through the CERCLA process. The Environmental Restoration Program intends to meet this requirement by using a {open_quotes}streamlined{close_quote} approach for selected tanks. This approach will combine the CERCLA Site Investigation. Remedial Action, Feasibility Study, and Proposed Plan requirements into a single Interim Proposed Plan document. This streamlined approach is expected to reduce the time required to complete the regulatory process while attaining acceptable risk reduction in a cost-effective way.« less