skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: WIP: Probabilistic Modeling of GPS-based Capabilities

; ; ;
Publication Date:
Research Org.:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
Sponsoring Org.:
OSTI Identifier:
Report Number(s):
DOE Contract Number:
Resource Type:
Resource Relation:
Conference: Presented at: SpringSim 2015, Alexandria, VA, United States, Apr 12 - Apr 15, 2015
Country of Publication:
United States

Citation Formats

Standley, V, Boucheron, E, Kirkwood, R, and Norman, B. WIP: Probabilistic Modeling of GPS-based Capabilities. United States: N. p., 2015. Web.
Standley, V, Boucheron, E, Kirkwood, R, & Norman, B. WIP: Probabilistic Modeling of GPS-based Capabilities. United States.
Standley, V, Boucheron, E, Kirkwood, R, and Norman, B. 2015. "WIP: Probabilistic Modeling of GPS-based Capabilities". United States. doi:.
title = {WIP: Probabilistic Modeling of GPS-based Capabilities},
author = {Standley, V and Boucheron, E and Kirkwood, R and Norman, B},
abstractNote = {},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = 2015,
month = 2

Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share:
  • Studies on efficient utilization and life extension of operating nuclear power plants (NPPs) have become increasingly important since ages of the first-generation NPPs are approaching their design lives. In order to predict a remaining life of each plant, it is necessary to select those critical components that strongly influence the plant life, and to evaluate their remaining lives by considering aging effects of materials and other factors. This paper proposes a new method to incorporate sophisticated crack models, such as interaction and coalescence of multiple surface cracks, into probabilistic fracture mechanism (PFM) computer programs using neural networks. First, hundreds ofmore » finite element (FE) calculations of a plate containing multiple surface cracks are performed by parametrically changing crack parameters such as sizes and locations. A fully automated 3D FE analysis system is effectively utilized here. Second, the back-propagation neural network is trained using the FE solutions, i.e. crack parameters vs. their corresponding stress intensity factors (SIFs). After a sufficient number of training iterations, the network attains an ability to promptly output SIFs for arbitrary combinations of crack parameters. The well trained network is then incorporated into the parallel PFM program which runs on one of massively parallel computers composed of 512 processing units. To demonstrate its fundamental performances, the present computer program is applied to evaluate failure probabilities of aged reactor pressure vessels considering interaction and coalescence of two dissimilar semi-elliptical surface cracks.« less
  • Low-level radioactive waste from cleanup activities at the Nevada Test Site and from multiple sites across the U.S. Department of Energy (DOE) complex is disposed at two active Radioactive Waste Management Sites (RWMS) on the Nevada Test Site. These facilities, which are managed by the DOE National Nuclear Security Administration Nevada Site Office, were recently designated as one of two regional disposal centers and yearly volumes of disposed waste now exceed 50,000 m3 (> 2 million ft3). To safely and cost-effectively manage the disposal facilities, the Waste Management Division of Environmental Management has implemented decision-based management practices using flexible andmore » problem-oriented probabilistic performance assessment modeling. Deterministic performance assessments and composite analyses were completed originally for the Area 5 and Area 3 RWMSs located in, respectively, Frenchman Flat and Yucca Flat on the Nevada Test Site. These documents provide the technical bases for issuance of disposal authorization statements for continuing operation of the disposal facilities. Both facilities are now in a maintenance phase that requires testing of conceptual models, reduction of uncertainty, and site monitoring all leading to eventual closure of the facilities and transition to long-term stewardship.« less
  • No abstract prepared.
  • Responsibility for the Safety Issue Prioritization program is assigned to the Safety Program Evaluation Branch in the Office of Nuclear Reactor Regulation. The program ranks the importance of reactor safety issues using quantitative measures of benefits and costs associated with the resolution of an issue along with qualitative factors. Because of the large number of issues to be analyzed in the ranking process, a procedure was developed that would permit each issue to be analyzed with a level-of-effort amounting to two man-weeks of labor. Existing risk, cost, and dose information are used in the analysis whenever possible. Existing probabilistic riskmore » assessments (PRAs) have been used in evaluating the change in public risk that would result from resolution of an issue. This paper briefly describes the issue analysis procedure and how the micro-computer programs are used in following the procedure. Next is a list of the PRAs that have been modeled and a discussion of how the micro-computer programs model the PRAs. Finally the advantages and the potential applications of these programs are described.« less