IDC Reengineering Phase 2 & 3 Project Scope
- Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sandia National Laboratories has prepared a cost estimate budgetary planning for the IDC Reengineering Phase 2 & 3 effort. This report provides the cost estimate and describes the methodology, assumptions, and cost model details used to create the cost estimate.
- Research Organization:
- Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC04-94AL85000
- OSTI ID:
- 1172791
- Report Number(s):
- SAND2014-18596R; 540401
- Country of Publication:
- United States
- Language:
- English
Similar Records
IDC reengineering Phase 2 & 3 US industry standard cost estimate summary
IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case).
IDC Reengineering Phase 2 & 3 Cost Estimate Summary (Version 1.0.1)
Technical Report
·
Thu Jan 01 00:00:00 EST 2015
·
OSTI ID:1172791
IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case).
Technical Report
·
Sat Nov 01 00:00:00 EDT 2014
·
OSTI ID:1172791
+1 more
IDC Reengineering Phase 2 & 3 Cost Estimate Summary (Version 1.0.1)
Technical Report
·
Mon Sep 01 00:00:00 EDT 2014
·
OSTI ID:1172791