skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Springfield Processing Plant* (A Hypothetical Facility) SPP, Entry Control Point and Vehicle Gate Access Control Post Order

Abstract

This hypothetical order provides the requirements and instructions for the Springfield Processing Plant (SPP) Vehicle Gate and Entry Control Point (ECP) in the perimeter access building. The purpose of this post is to prevent the theft, sabotage or diversion of nuclear material (NM), control access and exit at the protected area, and to respond to emergencies according the SPP Guard Force (GF) Contingency Plan and as directed by a Guard Force Supervisor.

Authors:
 [1]
  1. Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
Publication Date:
Research Org.:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sponsoring Org.:
USDOE National Nuclear Security Administration (NNSA)
OSTI Identifier:
1171446
Report Number(s):
SAND2014-15373R
534030
DOE Contract Number:  
AC04-94AL85000
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English

Citation Formats

Baum, Gregory A. Springfield Processing Plant* (A Hypothetical Facility) SPP, Entry Control Point and Vehicle Gate Access Control Post Order. United States: N. p., 2014. Web. doi:10.2172/1171446.
Baum, Gregory A. Springfield Processing Plant* (A Hypothetical Facility) SPP, Entry Control Point and Vehicle Gate Access Control Post Order. United States. doi:10.2172/1171446.
Baum, Gregory A. Sun . "Springfield Processing Plant* (A Hypothetical Facility) SPP, Entry Control Point and Vehicle Gate Access Control Post Order". United States. doi:10.2172/1171446. https://www.osti.gov/servlets/purl/1171446.
@article{osti_1171446,
title = {Springfield Processing Plant* (A Hypothetical Facility) SPP, Entry Control Point and Vehicle Gate Access Control Post Order},
author = {Baum, Gregory A.},
abstractNote = {This hypothetical order provides the requirements and instructions for the Springfield Processing Plant (SPP) Vehicle Gate and Entry Control Point (ECP) in the perimeter access building. The purpose of this post is to prevent the theft, sabotage or diversion of nuclear material (NM), control access and exit at the protected area, and to respond to emergencies according the SPP Guard Force (GF) Contingency Plan and as directed by a Guard Force Supervisor.},
doi = {10.2172/1171446},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Jun 01 00:00:00 EDT 2014},
month = {Sun Jun 01 00:00:00 EDT 2014}
}

Technical Report:

Save / Share: