Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples
Abstract
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub-Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D (Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent andmore »
- Authors:
-
- Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)
- Publication Date:
- Research Org.:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Org.:
- USDOE
- OSTI Identifier:
- 1167505
- Report Number(s):
- SRNL-STI-2014-00561
- DOE Contract Number:
- AC09-08SR22470
- Resource Type:
- Technical Report
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; MCU; ARP; ISDP
Citation Formats
Peters, T. B., and Washington, II, A. L. Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples. United States: N. p., 2015.
Web. doi:10.2172/1167505.
Peters, T. B., & Washington, II, A. L. Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples. United States. doi:10.2172/1167505.
Peters, T. B., and Washington, II, A. L. Tue .
"Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples". United States.
doi:10.2172/1167505. https://www.osti.gov/servlets/purl/1167505.
@article{osti_1167505,
title = {Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples},
author = {Peters, T. B. and Washington, II, A. L.},
abstractNote = {Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub-Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D(Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.},
doi = {10.2172/1167505},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jan 13 00:00:00 EST 2015},
month = {Tue Jan 13 00:00:00 EST 2015}
}
-
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub- Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutoniummore »
-
Sample results from the interim salt disposition program macrobatch 8 tank 21H qualification MST solids sample
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for Interim Salt Disposition Program (ISDP) processing. As part of this qualification work, SRNL performed an Actinide Removal Process (ARP) and several Extraction, Scrub, Strip (ESS) tests. This document reports characterization of the monosodium titanate (MST) solids from the ARP test. The results of these analyses are reported and are within historical precedent. -
Sample Results from the Interim Salt Disposition Program Macrobatch 6 Tank 21H Qualification Samples
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 6 for the Interim Salt Disposition Project (ISDP). This document reports partial results of the analyses of samples of Tank 21H. No issues with the projected Salt Batch 6 strategy are identified. -
Sample Results From The Interim Salt Disposition Program Macrobatch 6 Tank 21H Qualification Samples
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 6 for the Interim Salt Disposition Project (ISDP). This document reports partial results of the analyses of samples of Tank 21H. No issues with the projected Salt Batch 6 strategy are identified. -
Sample Results From The Interim Salt Disposition Program Macrobatch 7 Tank 21H Qualification Samples
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 7 for the Interim Salt Disposition Program (ISDP). An ARP and several ESS tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP/MCU. No issues with the projected Salt Batch 7 strategy are identified, other than the presence of visible quantities of dark colored solids. A demonstration of the monosodium titanate (0.2 g/L) removal of strontium and actinides provided acceptable 4 hour average decontamination factors for Pu and Sr ofmore »