skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples

Abstract

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub-Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D (Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent andmore » NGS be developed in order to improve our predictive capabilities for the ESS tests.« less

Authors:
 [1];  [1]
  1. Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)
Publication Date:
Research Org.:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1167505
Report Number(s):
SRNL-STI-2014-00561
DOE Contract Number:  
AC09-08SR22470
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; MCU; ARP; ISDP

Citation Formats

Peters, T. B., and Washington, II, A. L. Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples. United States: N. p., 2015. Web. doi:10.2172/1167505.
Peters, T. B., & Washington, II, A. L. Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples. United States. doi:10.2172/1167505.
Peters, T. B., and Washington, II, A. L. Tue . "Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples". United States. doi:10.2172/1167505. https://www.osti.gov/servlets/purl/1167505.
@article{osti_1167505,
title = {Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples},
author = {Peters, T. B. and Washington, II, A. L.},
abstractNote = {Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub-Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D(Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.},
doi = {10.2172/1167505},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jan 13 00:00:00 EST 2015},
month = {Tue Jan 13 00:00:00 EST 2015}
}

Technical Report:

Save / Share: