skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: June 2011 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site

Abstract

Annual natural gas and produced water monitoring was conducted for gas wells adjacent to Section 36, where the Gasbuggy test was conducted, in accordance with the draft Long-Term Surveillance and Maintenance Plan for the Gasbuggy Site, Rio Arriba County, New Mexico. Sampling and analysis were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351, continually updated). Natural gas samples were collected for tritium and carbon-14 analyses. Produced water samples were collected and analyzed for tritium, gamma-emitting radionuclides (by high-resolution gamma spectrometry), gross alpha, and gross beta. A duplicate produced water sample was collected from well 30-039-21743. Produced water samples were not collected at locations 30-039-30161 and 30-039-21744 because of the lack of water. Samples were not collected from location 30-039-29988 because the well was shut-in.

Authors:
 [1]
  1. S.M. Stoller Corporation, Broomfield, CO (United States)
Publication Date:
Research Org.:
S.M. Stoller Corporation, Broomfield, CO (United States)
Sponsoring Org.:
USDOE Office of Legacy Management (LM)
OSTI Identifier:
1114524
Report Number(s):
LMS/GSB-S00611
TRN: US1400229
DOE Contract Number:  
AM01-07LM00060
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; 58 GEOSCIENCES; 61 RADIATION PROTECTION AND DOSIMETRY

Citation Formats

Plessinger, Mark. June 2011 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site. United States: N. p., 2011. Web. doi:10.2172/1114524.
Plessinger, Mark. June 2011 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site. United States. doi:10.2172/1114524.
Plessinger, Mark. Sat . "June 2011 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site". United States. doi:10.2172/1114524. https://www.osti.gov/servlets/purl/1114524.
@article{osti_1114524,
title = {June 2011 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site},
author = {Plessinger, Mark},
abstractNote = {Annual natural gas and produced water monitoring was conducted for gas wells adjacent to Section 36, where the Gasbuggy test was conducted, in accordance with the draft Long-Term Surveillance and Maintenance Plan for the Gasbuggy Site, Rio Arriba County, New Mexico. Sampling and analysis were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351, continually updated). Natural gas samples were collected for tritium and carbon-14 analyses. Produced water samples were collected and analyzed for tritium, gamma-emitting radionuclides (by high-resolution gamma spectrometry), gross alpha, and gross beta. A duplicate produced water sample was collected from well 30-039-21743. Produced water samples were not collected at locations 30-039-30161 and 30-039-21744 because of the lack of water. Samples were not collected from location 30-039-29988 because the well was shut-in.},
doi = {10.2172/1114524},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2011},
month = {10}
}

Technical Report:

Save / Share: