"CONFIRMATORY SURVEY RESULTS FOR THE ABB COMBUSTION ENGINEERING SITE WINDSOR, CONNECTICUT DCN 5158-SR-02-2
The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.
- Research Organization:
- Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC)
- DOE Contract Number:
- DE-AC0506OR23100
- OSTI ID:
- 1096529
- Report Number(s):
- 13-IEAV-1113
- Country of Publication:
- United States
- Language:
- English
Similar Records
Final Report-Confirmatory Survey Results for the ABB Combustion Engineering Site, Windsor, Connecticut; Revision 1 (DCN 5158-SR-02-1) (Docket No. 030-03754; RFTA No. 12-003)
"INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE FORD NUCLEAR REACTOR, REVISION 1, ANN ARBOR, MICHIGAN
INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE FORD NUCLEAR REACTOR, ANN ARBOR, MICHIGAN
Technical Report
·
Mon Jan 28 00:00:00 EST 2013
·
OSTI ID:1096529
"INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE FORD NUCLEAR REACTOR, REVISION 1, ANN ARBOR, MICHIGAN
Technical Report
·
Thu Aug 01 00:00:00 EDT 2013
·
OSTI ID:1096529
INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE FORD NUCLEAR REACTOR, ANN ARBOR, MICHIGAN
Technical Report
·
Thu Jul 25 00:00:00 EDT 2013
·
OSTI ID:1096529