skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Preconceptual ABC design definition and system configuration layout: Appendix A

Technical Report ·
DOI:https://doi.org/10.2172/106600· OSTI ID:106600

The mission of the ABC system is to destroy as effectively as possible the fissile material inserted into the core without producing any new fissile material. The contents of this report are as follows: operating conditions for the steam-cycle ABC system; flow rates and component dimensions; drawings of the ABC layout; and impact of core design parameters on containment size.

Research Organization:
Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Barthold Associates, Inc., Knoxville, TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-7405-ENG-36
OSTI ID:
106600
Report Number(s):
LA-SUB-95-137; ON: DE95017809; TRN: 95:022021
Resource Relation:
Other Information: PBD: Mar 1995
Country of Publication:
United States
Language:
English