Title: Renewing Rock-Tenn: A Biomass Fuels Assessment for Rock-Tenn's St. Paul Recycled Paper Mill.

Abstract

In the summer of 2006 the Green Institute started the study for the RockTenn paper mill that would evaluate the economics and supply chain reliability of wood waste and other clean biomass as a fuel for the facility. The Green Institute obtained sponsorship from a broad coalition representing the community and the project team included other consultants and university researchers specializing in biomass issues. The final product from the project was a report to: 1) assess the availability of clean biomass fuel for use at the Rock-Tenn site; 2) roughly estimate costs at various annual usage quantities; and 3) develop the building blocks for a supply chain procurement plan. The initial report was completed and public presentations on the results were completed in spring of 2007.

Authors:
Publication Date:
Research Org.:
The Green Institute
Sponsoring Org.:
USDOE; USDOE EE Office of Biomass (EE-2E)
OSTI Identifier:
1054505
Report Number(s):
DOE GO13049-1
DOE Contract Number:
FC36-03GO13049
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
09 BIOMASS FUELS; Fuels Assessment; Fuel Supply

Citation Formats

Nelson, Carl. Renewing Rock-Tenn: A Biomass Fuels Assessment for Rock-Tenn's St. Paul Recycled Paper Mill.. United States: N. p., 2007. Web. doi:10.2172/1054505.
Nelson, Carl. Renewing Rock-Tenn: A Biomass Fuels Assessment for Rock-Tenn's St. Paul Recycled Paper Mill.. United States. doi:10.2172/1054505.
Nelson, Carl. Sat . "Renewing Rock-Tenn: A Biomass Fuels Assessment for Rock-Tenn's St. Paul Recycled Paper Mill.". United States. doi:10.2172/1054505. https://www.osti.gov/servlets/purl/1054505.
@article{osti_1054505,
title = {Renewing Rock-Tenn: A Biomass Fuels Assessment for Rock-Tenn's St. Paul Recycled Paper Mill.},
author = {Nelson, Carl},
abstractNote = {In the summer of 2006 the Green Institute started the study for the RockTenn paper mill that would evaluate the economics and supply chain reliability of wood waste and other clean biomass as a fuel for the facility. The Green Institute obtained sponsorship from a broad coalition representing the community and the project team included other consultants and university researchers specializing in biomass issues. The final product from the project was a report to: 1) assess the availability of clean biomass fuel for use at the Rock-Tenn site; 2) roughly estimate costs at various annual usage quantities; and 3) develop the building blocks for a supply chain procurement plan. The initial report was completed and public presentations on the results were completed in spring of 2007.},
doi = {10.2172/1054505},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Mar 31 00:00:00 EDT 2007},
month = {Sat Mar 31 00:00:00 EDT 2007}
}

Technical Report:

Save / Share:
  • The goals of the St. Paul District Heating Demonstration Project are (1) to assess the detailed economic feasibility of a hot water, cogeneration district heating system serving the central business district of St. Paul, Minnesota, and (2) to develop an implementation plan for financing and construction of the first phase of the system over a four-five year time span. This report presents the results of a conceptual design for a 270-MW(t) hot water district heating system serving the central business district of St. Paul and the nearby State Capitol Complex. The system design is based on extensive European hot watermore » design and operating experience. The base heat source for the system is the Northern States Power Co. (NSP) High Bridge Power Plant which has three turbines that can be retrofitted to either extraction or back-pressure cogeneration operation. Hot water at 250/sup 0/F (121/sup 0/C), produced in steam-to-water heat exchangers, is transported to the St. Paul central business district 0.8 miles (1.3 km) away. This conceptual design includes the supply-and-return transmission lines from the High Bridge Plant but does not include the design and cost of piping, heat exchangers, pumps, and controls for retrofitting the High Bridge Plant to cogeneration operation. The system design and construction costs developed in this study are based on the geotechnical analysis of the market area, piping design criteria including code requirements, and piping installation procedures that maximize system reliability and maintainability. The construction cost is developed for a four-five year construction phase based on analyses of the market by the St. Paul DHDC. The total construction cost for the hot water transmission and distribution system in mid-1980 (ENR index = 3200) prices is $29,000,000 including engineering and contingencies. Plant modifications to three power plants for system peaking and reserve requirements are estimated at $4,009, 500.« less
  • The goals of the St. Paul District Heating Demonstration Project are: (1) to assess the detailed economic feasibility of a cogeneration, hot water district heating system servicing the commercial core area of St. Paul, Minnesota, and (2) to develop an implementation plan for financing and construction of the first phase of the system over a four- to five-year time span. The results of the economic feasibility assessment and the implementation plan are presented. The economic assessment is based on engineering studies of the detailed heat load and market definition, building conversion methods and costs, St. Paul area heat sources, andmore » the conceptual design of the piping distribution system. Extensive use of Swedish hot water district heating technology and experience with cogeneration heat sources is incorporated in the design to minimize capital and operating costs. The heat load survey determined a 300-MW(t) total heat load in the initial market area. The market is composed of over 300 buildings, including four major hospitals and the State Capitol complex. A significant fraction (50%) of the buildings have internal steam distribution systems, many of which are old and in need of repair. Building conversion studies disclosed a wide range of costs for upgrading and connection of a 250/sup 0/F hot water supply system. Costs were estimated for the piping systems, peaking heat sources, and building conversion from project studies. The results of the preliminary economic feasibility study established the business plan and key project requirements leading to the construction of a $44 million hot water district heating system in St. Paul.« less
  • This report evaluates the New York paper mill industry in terms of the productive management and treatment of solid wastes. It identifies current efforts by recycling mills to beneficially use paper mill residuals (often called sludge) and suggests additional options that should be considered by the industry in general and individual mills in particular. It also examines the regulations and economics affecting the mills and suggests actions that could improve the industry`s ability to convert wastes to value-added products. The report recommends that the mills should continue measures to reduce fiber and filler clay losses, promote the transfer of usablemore » fiber and clay to mills able to use them, upgrade sludge dewatering capabilities, and take a more regional approach to solid waste disposal problems. State agencies are urged to support these efforts, encourage the development and commercialization of new beneficial use technologies, and reduce regulatory barriers whenever possible.« less
  • New York State paper mills are facing increasing problems with sludge disposal. In particular, costs for landfill disposal are rising. At a recent NYSERDA workshop, one recommendation was to help plants assess their sludge and identify potential technologies that could lead to beneficial use. In the project, NYSERDA and the New York State Department of Economic Development decided to work together to help New York State paper mills find more cost-effective sludge-disposal alternatives. The objectives were to: identify viable beneficial uses of paper sludge from mills using post-consumer fiber; identify the sludge generation and management practices of paper mills participatingmore » in the survey; identify the major obstacles to beneficial reuse of post-consumer fiber sludge in New York State; and develop a set of recommendations for fostering beneficial uses of paper sludge in New York State`s paper industry.« less
  • The report describes the (1) analysis of field observations for aquifer characterization and observation network design, (2) preliminary model analysis to determine model sensitivity to hydraulic and thermal characteristics and to facilitate final model design, and (3) aquifer thermal efficiency. The report is the first of three reports that describes the potential for thermal-energy storage within the Franconia-Ironton-Galesville aquifer located beneath the St. Paul campus of the University of Minnesota.