Western Baldwin County, AL Grid Interconnection Project
Abstract
The Objective of this Project was to provide an additional supply of electricity to the affected portions of Baldwin County, AL through the purchase, installation, and operation of certain substation equipment.
- Authors:
- Publication Date:
- Research Org.:
- Utilities Board Of The City Of Foley
- Sponsoring Org.:
- USDOE
- OSTI Identifier:
- 1048882
- DOE Contract Number:
- OE0000482
- Resource Type:
- Technical Report
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 24 POWER TRANSMISSION AND DISTRIBUTION
Citation Formats
Thomas DeBell. Western Baldwin County, AL Grid Interconnection Project. United States: N. p., 2011.
Web. doi:10.2172/1048882.
Thomas DeBell. Western Baldwin County, AL Grid Interconnection Project. United States. doi:10.2172/1048882.
Thomas DeBell. Fri .
"Western Baldwin County, AL Grid Interconnection Project". United States.
doi:10.2172/1048882. https://www.osti.gov/servlets/purl/1048882.
@article{osti_1048882,
title = {Western Baldwin County, AL Grid Interconnection Project},
author = {Thomas DeBell},
abstractNote = {The Objective of this Project was to provide an additional supply of electricity to the affected portions of Baldwin County, AL through the purchase, installation, and operation of certain substation equipment.},
doi = {10.2172/1048882},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Sep 30 00:00:00 EDT 2011},
month = {Fri Sep 30 00:00:00 EDT 2011}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.
-
Grid Integration of Aggregated Demand Response, Part 1: Load Availability Profiles and Constraints for the Western Interconnection
Demand response (DR) has the potential to improve electric grid reliability and reduce system operation costs. However, including DR in grid modeling can be difficult due to its variable and non-traditional response characteristics, compared to traditional generation. Therefore, efforts to value the participation of DR in procurement of grid services have been limited. In this report, we present methods and tools for predicting demand response availability profiles, representing their capability to participate in capacity, energy, and ancillary services. With the addition of response characteristics mimicking those of generation, the resulting profiles will help in the valuation of the participation ofmore » -
A Project to Foster State/Industry Collaboration in the Creation of a Competitive and Reliable Electric Power System in the Western Interconnection
This report represents the views of the Western Interstate Energy Board. -
Redding Direct Interconnection Project, Shasta County, California:
As required under the California Environemtnal Quality Act (CEQA), the City of Redding (City) has prepared an Environmental Impact report (EIR) for the proposed Direct interconnection Project. Western Area Power Administration (Western) is also required to prepare an environmental assessment (EA) under the National Environmental Policy Act (NEPA) due to its involvement in the Project. Since the City has alrady prepared their EIR, this EA will briefly summarize the impact assessment field work and findings from the City's EIR. The EIR is attached as an appendix to this EA. 21 refs., 20 figs., 10 tabs. -
Advanced Platform for Development and Evaluation of Grid Interconnection Systems Using Hardware-in-the-Loop: Part III - Grid Interconnection System Evaluator
This paper describes a Grid Interconnection System Evaluator (GISE) that leverages hardware-in-the-loop (HIL) simulation techniques to rapidly evaluate the grid interconnection standard conformance of an ICS according to the procedures in IEEE Std 1547.1. The architecture and test sequencing of this evaluation tool, along with a set of representative ICS test results from three different photovoltaic (PV) inverters, are presented. The GISE adds to the National Renewable Energy Laboratory's (NREL) evaluation platform that now allows for rapid development of ICS control algorithms using controller HIL (CHIL) techniques, the ability to test the dc input characteristics of PV-based ICSs through themore »