Predictive Capability Maturity Model (PCMM).
Conference
·
OSTI ID:1028336
Predictive Capability Maturity Model (PCMM) is a communication tool that must include a dicussion of the supporting evidence. PCMM is a tool for managing risk in the use of modeling and simulation. PCMM is in the service of organizing evidence to help tell the modeling and simulation (M&S) story. PCMM table describes what activities within each element are undertaken at each of the levels of maturity. Target levels of maturity can be established based on the intended application. The assessment is to inform what level has been achieved compared to the desired level, to help prioritize the VU activities & to allocate resources.
- Research Organization:
- Sandia National Laboratories (SNL), Albuquerque, NM, and Livermore, CA (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC04-94AL85000
- OSTI ID:
- 1028336
- Report Number(s):
- SAND2010-7545C; TRN: US201122%%204
- Resource Relation:
- Conference: Proposed for presentation at the NEAMS PI Meeting held October 18-20, 2010 in Washington, DC.
- Country of Publication:
- United States
- Language:
- English
Similar Records
A framework for assessment of predictive capability maturity and its application in nuclear thermal hydraulics
Uncertainty quantification's role in modeling and simulation planning, and credibility assessment through the predictive capability maturity model
Predictive Maturity of Multi-Scale Simulation Models for Fuel Performance
Journal Article
·
Sat Aug 10 00:00:00 EDT 2019
· Nuclear Engineering and Design
·
OSTI ID:1028336
Uncertainty quantification's role in modeling and simulation planning, and credibility assessment through the predictive capability maturity model
Book
·
Wed Apr 13 00:00:00 EDT 2016
·
OSTI ID:1028336
Predictive Maturity of Multi-Scale Simulation Models for Fuel Performance
Technical Report
·
Mon Mar 16 00:00:00 EDT 2015
·
OSTI ID:1028336
+2 more