Title: RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility

Conference ·
OSTI ID:1021488

Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the full cryomodule have been performed. We report on the results of these tests and lessons learned which will have an impact on future module testing at Fermilab. Since November 2010 Cryomodule 1 has been operating at 2 Kelvin. After evaluating each of the eight cavities while individually powered, the entire module has recently been powered and peak operation determined as shown in Figure 4. Several more weeks of measurements are planned before the module is warmed up, removed and replaced with Cryomodule 2 now under assembly at Fermilab.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1021488
Report Number(s):
FERMILAB-CONF-11-352-AD-TD; TRN: US1104000
Resource Relation:
Conference: Presented at 15th International Conference on RF Superconductivity (SRF2011), Chicago, Illinois, USA, 25-29 Jul 2011
Country of Publication:
United States
Language:
English