skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Inspections performed by Du Pont on the telescope actuator system: Part 4

Abstract

Five telescope actuator systems designated as ``R``, ``P``, ``L``, ``K`` and ``C`` were fabricated at New York Ship. All five were similar in specifications except for minor detail. For overall assembly refer to du Pont arrangement drawings W-153422, W-153423, and W-153424. These drawings illustrate ``R`` unit; however, they are representative of all units. They show a complete listing of material required and an overall view of the telescoping assembly. Since jigs and special tooling were set up to conform to a definite deck plate fabrication sequence, the inspection procedures and methods described in this book will follow logically the fabrication steps.

Authors:
Publication Date:
Research Org.:
Du Pont de Nemours (E.I.) and Co., Aiken, SC (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10192392
Report Number(s):
SR/H-835
ON: DE95002287
DOE Contract Number:  
AC09-76SR00001
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 1 Nov 1953
Country of Publication:
United States
Language:
English
Subject:
22 GENERAL STUDIES OF NUCLEAR REACTORS; PRODUCTION REACTORS; REACTOR CONTROL SYSTEMS; ACTUATORS; MACHINING; FABRICATION; REACTOR COMPONENTS; 220400; 220600; CONTROL SYSTEMS; RESEARCH, TEST, TRAINING, PRODUCTION, IRRADIATION, MATERIALS TESTING REACTORS

Citation Formats

Stewart, J R. Inspections performed by Du Pont on the telescope actuator system: Part 4. United States: N. p., 1953. Web. doi:10.2172/10192392.
Stewart, J R. Inspections performed by Du Pont on the telescope actuator system: Part 4. United States. https://doi.org/10.2172/10192392
Stewart, J R. Sun . "Inspections performed by Du Pont on the telescope actuator system: Part 4". United States. https://doi.org/10.2172/10192392. https://www.osti.gov/servlets/purl/10192392.
@article{osti_10192392,
title = {Inspections performed by Du Pont on the telescope actuator system: Part 4},
author = {Stewart, J R},
abstractNote = {Five telescope actuator systems designated as ``R``, ``P``, ``L``, ``K`` and ``C`` were fabricated at New York Ship. All five were similar in specifications except for minor detail. For overall assembly refer to du Pont arrangement drawings W-153422, W-153423, and W-153424. These drawings illustrate ``R`` unit; however, they are representative of all units. They show a complete listing of material required and an overall view of the telescoping assembly. Since jigs and special tooling were set up to conform to a definite deck plate fabrication sequence, the inspection procedures and methods described in this book will follow logically the fabrication steps.},
doi = {10.2172/10192392},
url = {https://www.osti.gov/biblio/10192392}, journal = {},
number = ,
volume = ,
place = {United States},
year = {1953},
month = {11}
}