Title: Waste analysis plan for confirmation or completion of Tank Farms backlog waste designation

Abstract

This waste analysis plan satisfies the requirements of Item 3 of Ecology Order 93NM-201 as amended per the Settlement Agreement. Item 3 states: ``Within forty (40) calendar days of receipt of this Order, the US Department of Energy Richland Operations (DOE-RL) and Westinghouse Hanford Company (WHC) shall provide Ecology with a plan for review and approval detailing the established criteria and procedures for waste inspection, segregation, sampling, designation, and repackaging of all containers reported in item {number_sign}1. The report shall include sampling plan criteria for different contaminated media, i.e., soils, compactable waste, high-efficiency particular air (HEPA) filters, etc., and a schedule for completing the work within the time allowed under this Order.`` Item 3 was amended per the Settlement Agreement as follows: ``In addition to the waste inspection plans for the ``unknowns`` previously provided and currently being supplemented, DOE-RL and WHC shall provide a draft waste analysis plan for the containers reported in Item 1 of the Order to Ecology by July 12, 1993. A final, DOE-RL approved waste analysis plan shall be submitted to Ecology by September 1, 1993, for Ecology`s written approval by September 15, 1993.`` Containers covered by the Order, Settlement Agreement, and this waste analysis planmore » consist of all those reported under Item 1 of the Order, less any containers that have been identified in unusual occurrences reported by Tank Farms. This waste analysis plan describes the procedures that will be undertaken to confirm or to complete designation of the solid waste identified in the Order.« less

Publication Date:
Research Org.:
USDOE Richland Operations Office, WA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10185595
Report Number(s):
DOE/RL-93-70
ON: DE93041134; TRN: 93:022959
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Aug 1993
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; HANFORD RESERVATION; WASTE MANAGEMENT; SOLID WASTES; CHEMICAL ANALYSIS; CONTAINERS; SAMPLING; REGULATIONS; COMPLIANCE; SAMPLE PREPARATION; HAZARDOUS MATERIALS; LOW-LEVEL RADIOACTIVE WASTES; MIXTURES; CHEMICAL WASTES; COMPILED DATA; 052000

Citation Formats

. Waste analysis plan for confirmation or completion of Tank Farms backlog waste designation. United States: N. p., 1993. Web. doi:10.2172/10185595.
. Waste analysis plan for confirmation or completion of Tank Farms backlog waste designation. United States. doi:10.2172/10185595.
. Sun . "Waste analysis plan for confirmation or completion of Tank Farms backlog waste designation". United States. doi:10.2172/10185595. https://www.osti.gov/servlets/purl/10185595.
@article{osti_10185595,
title = {Waste analysis plan for confirmation or completion of Tank Farms backlog waste designation},
author = {},
abstractNote = {This waste analysis plan satisfies the requirements of Item 3 of Ecology Order 93NM-201 as amended per the Settlement Agreement. Item 3 states: ``Within forty (40) calendar days of receipt of this Order, the US Department of Energy Richland Operations (DOE-RL) and Westinghouse Hanford Company (WHC) shall provide Ecology with a plan for review and approval detailing the established criteria and procedures for waste inspection, segregation, sampling, designation, and repackaging of all containers reported in item {number_sign}1. The report shall include sampling plan criteria for different contaminated media, i.e., soils, compactable waste, high-efficiency particular air (HEPA) filters, etc., and a schedule for completing the work within the time allowed under this Order.`` Item 3 was amended per the Settlement Agreement as follows: ``In addition to the waste inspection plans for the ``unknowns`` previously provided and currently being supplemented, DOE-RL and WHC shall provide a draft waste analysis plan for the containers reported in Item 1 of the Order to Ecology by July 12, 1993. A final, DOE-RL approved waste analysis plan shall be submitted to Ecology by September 1, 1993, for Ecology`s written approval by September 15, 1993.`` Containers covered by the Order, Settlement Agreement, and this waste analysis plan consist of all those reported under Item 1 of the Order, less any containers that have been identified in unusual occurrences reported by Tank Farms. This waste analysis plan describes the procedures that will be undertaken to confirm or to complete designation of the solid waste identified in the Order.},
doi = {10.2172/10185595},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1993},
month = {8}
}