Piping benchmark problems for the ABB/CE System 80+ Standardized Plant
- Brookhaven National Lab., Upton, NY (United States)
To satisfy the need for verification of the computer programs and modeling techniques that will be used to perform the final piping analyses for the ABB/Combustion Engineering System 80+ Standardized Plant, three benchmark problems were developed. The problems are representative piping systems subjected to representative dynamic loads with solutions developed using the methods being proposed for analysis for the System 80+ standard design. It will be required that the combined license licensees demonstrate that their solution to these problems are in agreement with the benchmark problem set. The first System 80+ piping benchmark is a uniform support motion response spectrum solution for one section of the feedwater piping subjected to safe shutdown seismic loads. The second System 80+ piping benchmark is a time history solution for the feedwater piping subjected to the transient loading induced by a water hammer. The third System 80+ piping benchmark is a time history solution of the pressurizer surge line subjected to the accelerations induced by a main steam line pipe break. The System 80+ reactor is an advanced PWR type.
- Research Organization:
- US Nuclear Regulatory Commission (NRC), Washington, DC (United States). Div. of Engineering; Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- Nuclear Regulatory Commission, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH00016
- OSTI ID:
- 10173738
- Report Number(s):
- NUREG/CR-6128; BNL-NUREG-52396; ON: TI94016707; TRN: 94:015630
- Resource Relation:
- Other Information: PBD: Jul 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
Large Break LOCA Safety Injection Sensitivity for a CE/ABB System 80+ PWR
Benchmark analysis for the design of piping systems in advanced reactors
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
PWR TYPE REACTORS
AUXILIARY WATER SYSTEMS
PRIMARY COOLANT CIRCUITS
PIPES
COMPUTER-AIDED DESIGN
COMPUTER CODES
VALIDATION
STANDARDIZATION
SUPPORTS
WATER HAMMER
COMPILED DATA
220900
210200
REACTOR SAFETY
POWER REACTORS
NONBREEDING
LIGHT-WATER MODERATED
NONBOILING WATER COOLED