Title: Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

Abstract

This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receivemore » immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

Authors:
Publication Date:
Research Org.:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
OSTI Identifier:
10154135
Report Number(s):
HNF-2021-Rev.1
ON: DE99050456; BR: EW3130010; TRN: AHC29928%%22
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 9 Jan 1998
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; HANFORD RESERVATION; STORAGE FACILITIES; REMEDIAL ACTION; WASTE RETRIEVAL; CONTRACT MANAGEMENT; IMPLEMENTATION; RADIOACTIVE WASTE PROCESSING; SYSTEMS ANALYSIS; 054000; 052002; HEALTH AND SAFETY; WASTE DISPOSAL AND STORAGE

Citation Formats

Honeyman, J O. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization. United States: N. p., 1998. Web. doi:10.2172/10154135.
Honeyman, J O. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization. United States. https://doi.org/10.2172/10154135
Honeyman, J O. 1998. "Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization". United States. https://doi.org/10.2172/10154135. https://www.osti.gov/servlets/purl/10154135.
@article{osti_10154135,
title = {Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization},
author = {Honeyman, J O},
abstractNote = {This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.},
doi = {10.2172/10154135},
url = {https://www.osti.gov/biblio/10154135}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Jan 09 00:00:00 EST 1998},
month = {Fri Jan 09 00:00:00 EST 1998}
}