Title: Decontamination and inspection plan for phase 2 closure of the 300-Area waste acid treatment system

Abstract

This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 2 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 2, the second phase of three proposed phases of closure for WATS, provides for closure of all WATS portions of the 334-A Building and some, but not all, WATS portions of the 333 and 303-F Buildings. Closure of the entire unit will not occur until all three closure phases have been completed. The DIP also describes the designation and management-process for waste and debris generated during Phase 2 closure activities. Information regarding the decontamination and verification methods for Phase 1 closure can be found in Decontamination and Inspection Plan, for Phase 1 closure of the 300 Area Waste Acid Treatment System, 21 WHC-SD-ENV-AP-001. Information regarding Phase 3 closure will be provided in later documents.

Authors:
Publication Date:
Research Org.:
Fluor Daniel Hanford Inc., Richland, WA (United States)
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
OSTI Identifier:
10148303
Report Number(s):
HNF-1784
ON: DE99050620; BR: EW3130010; TRN: AHC29927%%94
DOE Contract Number:
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 6 Feb 1998
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; DECONTAMINATION; INSPECTION; HANFORD RESERVATION; RADIOACTIVE WASTE PROCESSING; RADIOACTIVE WASTE FACILITIES; PLANNING; DECOMMISSIONING; 054000; 052001; HEALTH AND SAFETY; WASTE PROCESSING

Citation Formats

Hays, C.B. Decontamination and inspection plan for phase 2 closure of the 300-Area waste acid treatment system. United States: N. p., 1998. Web. doi:10.2172/10148303.
Hays, C.B. Decontamination and inspection plan for phase 2 closure of the 300-Area waste acid treatment system. United States. doi:10.2172/10148303.
Hays, C.B. Fri . "Decontamination and inspection plan for phase 2 closure of the 300-Area waste acid treatment system". United States. doi:10.2172/10148303. https://www.osti.gov/servlets/purl/10148303.
@article{osti_10148303,
title = {Decontamination and inspection plan for phase 2 closure of the 300-Area waste acid treatment system},
author = {Hays, C.B.},
abstractNote = {This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 2 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 2, the second phase of three proposed phases of closure for WATS, provides for closure of all WATS portions of the 334-A Building and some, but not all, WATS portions of the 333 and 303-F Buildings. Closure of the entire unit will not occur until all three closure phases have been completed. The DIP also describes the designation and management-process for waste and debris generated during Phase 2 closure activities. Information regarding the decontamination and verification methods for Phase 1 closure can be found in Decontamination and Inspection Plan, for Phase 1 closure of the 300 Area Waste Acid Treatment System, 21 WHC-SD-ENV-AP-001. Information regarding Phase 3 closure will be provided in later documents.},
doi = {10.2172/10148303},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Feb 06 00:00:00 EST 1998},
month = {Fri Feb 06 00:00:00 EST 1998}
}

Technical Report:

Save / Share:
  • This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 3 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 3 is the third phase of three WATS closure phases. Phase 3 attains clean closure conditions for WATS portions of the 334 and 311 Tank Farms (TF) and the 333 and 303-F Buildings. This DIP also describes designation and management of waste and debris generated during Phase 3 closure activities. Information regarding Phase 1 and Phase 2 for decontamination and verification activities closure can be found in WHC-SD-ENV-AP-001 and HNF-1784, respectively. This DIPmore » is provided as a supplement to the closure plan (DOE/RL-90-11). This DIP provides the documentation for Ecology concurrence with Phase 3 closure methods and activities. This DIP is intended to provide greater detail than is contained in the closure plan to satisfy Ecology Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 requirement that closure documents describe the methods for removing, transporting, storing, and disposing of all dangerous waste at the unit. The decontamination and verification activities described in this DIP are based on the closure plan and on agreements reached between Ecology and the U.S. Department of Energy, Richland Operations Office (DOE-RL) during Phase 3 closure activity workshops and/or project manager meetings (PMMs).« less
  • This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.
  • The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less
  • This document describes activities for the closure of a hazardous waste tank treatment facility operated by the US Department of Energy-Richland Operations Office (DOE-RL) and co-operated by the Westinghouse Hanford Company (WHC). This treatment facility was a solvent evaporator located in the 300 Area of the Hanford Site, from 1975 to 1985 on behalf of DOE-RL. The 300 Area Solvent Evaporator (300 ASE) was a modified load lugger (dumpster) in which solvent wastes were evaporated. Some of the solvents were radioactively contaminated because they came from a degreaser which processed bare uranium metal billets from the N Reactor Fuel Manufacturingmore » Facility. The waste was composed of perchloroethylene, trichloroethylene, 1,1,1-trichloroethane, ethyl acetate/bromine solution, paint shop solvents and possibly some used oil. Also, small amounts of uranium, copper, zirconium and possibly beryllium were present in the degreaser solvents as particulates. Radioactive and non-radioactive solvents were not segregated in the 300 ASE, and the entire mixture was regarded as mixed waste.« less
  • This closure plan has been prepared for the interim Reactive Waste Treatment Area (IRWT'A) located at the Y-12 Pkmt in oak Ridge, Tennessee (Environmental Protection Agency [EPA] Identification TN 389-009-0001). The actions required to achieve closure of the IRWTA are outlined in this plan, which is being submitted in accordance with Tennessee Ruie 1200- 1-1 1-.0S(7) and Title 40, Code of Federal Regulations (CFR), Part 265, Subpart G. The IRWTA was used to treat waste sodium and potassium (NaK) that are regulated by the Resource Conservation and Recovery Act (RCRA). The location of the IRWT'A is shown in Figures 1more » and 2, and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.« less