Title: Functional performance requirements for seismic network upgrade

Abstract

The SRL seismic network, established in 1976, was developed to monitor site and regional seismic activity that may have any potential to impact the safety or reduce containment capability of existing and planned structures and systems at the SRS, report seismic activity that may be relevant to emergency preparedness, including rapid assessments of earthquake location and magnitude, and estimates of potential on-site and off-site damage to facilities and lifelines for mitigation measures. All of these tasks require SRL seismologists to provide rapid analysis of large amounts of seismic data. The current seismic network upgrade, the subject of this Functional Performance Requirements Document, is necessary to improve system reliability and resolution. The upgrade provides equipment for the analysis of the network seismic data and replacement of old out-dated equipment. The digital network upgrade is configured for field station and laboratory digital processing systems. The upgrade consists of the purchase and installation of seismic sensors,, data telemetry digital upgrades, a dedicated Seismic Data Processing (SDP) system (already in procurement stage), and a Seismic Signal Analysis (SSA) system. The field stations and telephone telemetry upgrades include equipment necessary for three remote station upgrades including seismic amplifiers, voltage controlled oscillators, pulse calibrators, weather protectionmore » (including lightning protection) systems, seismometers, seismic amplifiers, and miscellaneous other parts. The central receiving and recording station upgrades will include discriminators, helicopter amplifier, omega timing system, strong motion instruments, wide-band velocity sensors, and other miscellaneous equipment.« less

Authors:
Publication Date:
Research Org.:
Westinghouse Savannah River Co., Aiken, SC (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10137350
Report Number(s):
SRL-ESS-91-914
ON: DE93008928
DOE Contract Number:  
AC09-89SR18035
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 18 Aug 1991
Country of Publication:
United States
Language:
English
Subject:
22 GENERAL STUDIES OF NUCLEAR REACTORS; DATA ACQUISITION SYSTEMS; MODIFICATIONS; SEISMIC ARRAYS; SAVANNAH RIVER PLANT; COMPUTERS; SEISMIC EFFECTS; TELEMETRY; REACTOR SAFETY; 220900; 220600; RESEARCH, TEST, TRAINING, PRODUCTION, IRRADIATION, MATERIALS TESTING REACTORS

Citation Formats

Lee, R C. Functional performance requirements for seismic network upgrade. United States: N. p., 1991. Web.
Lee, R C. Functional performance requirements for seismic network upgrade. United States.
Lee, R C. Sun . "Functional performance requirements for seismic network upgrade". United States.
@article{osti_10137350,
title = {Functional performance requirements for seismic network upgrade},
author = {Lee, R C},
abstractNote = {The SRL seismic network, established in 1976, was developed to monitor site and regional seismic activity that may have any potential to impact the safety or reduce containment capability of existing and planned structures and systems at the SRS, report seismic activity that may be relevant to emergency preparedness, including rapid assessments of earthquake location and magnitude, and estimates of potential on-site and off-site damage to facilities and lifelines for mitigation measures. All of these tasks require SRL seismologists to provide rapid analysis of large amounts of seismic data. The current seismic network upgrade, the subject of this Functional Performance Requirements Document, is necessary to improve system reliability and resolution. The upgrade provides equipment for the analysis of the network seismic data and replacement of old out-dated equipment. The digital network upgrade is configured for field station and laboratory digital processing systems. The upgrade consists of the purchase and installation of seismic sensors,, data telemetry digital upgrades, a dedicated Seismic Data Processing (SDP) system (already in procurement stage), and a Seismic Signal Analysis (SSA) system. The field stations and telephone telemetry upgrades include equipment necessary for three remote station upgrades including seismic amplifiers, voltage controlled oscillators, pulse calibrators, weather protection (including lightning protection) systems, seismometers, seismic amplifiers, and miscellaneous other parts. The central receiving and recording station upgrades will include discriminators, helicopter amplifier, omega timing system, strong motion instruments, wide-band velocity sensors, and other miscellaneous equipment.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1991},
month = {8}
}

Technical Report:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item. Keep in mind that many technical reports are not cataloged in WorldCat.

Save / Share: