skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Hospital waste shredder test series at the DONLEE Pilot Test Facility. Final report

Abstract

This report describes the coal firing and coal and noninfectious hospital waste co-firing testing and emissions rates for the tests conducted at the DONLEE pilot plant facility during mid-December 1991 through early March 1992. The emissions obtained during these tests are in turn used to predict the emission rates for the proof-of-concept facility that is to be built at the Lebanon Veterans Affairs Medical Center. In addition, the reliability and performance of the waste shredding/feeding system were evaluated from this testing.

Publication Date:
Research Org.:
Good Samaritan Hospital, Lebanon, PA (United States); Donlee Technologies, Inc., York, PA (United States). York-Shipley Div.
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10124996
Report Number(s):
DOE/MC/25033-3237
ON: DE93000243
DOE Contract Number:  
FG21-88MC25033
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Sep 1992
Country of Publication:
United States
Language:
English
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; 20 FOSSIL-FUELED POWER PLANTS; SHREDDERS; PERFORMANCE; MEDICAL SUPPLIES; COCOMBUSTION; FURNACES; PROGRESS REPORT; HOSPITALS; MUNICIPAL WASTES; PILOT PLANTS; ANTHRACITE; TEST FACILITIES; 320604; 200103; MUNICIPAL WASTE MANAGEMENT; WASTE-FUELED SYSTEMS

Citation Formats

. Hospital waste shredder test series at the DONLEE Pilot Test Facility. Final report. United States: N. p., 1992. Web. doi:10.2172/10124996.
. Hospital waste shredder test series at the DONLEE Pilot Test Facility. Final report. United States. https://doi.org/10.2172/10124996
. 1992. "Hospital waste shredder test series at the DONLEE Pilot Test Facility. Final report". United States. https://doi.org/10.2172/10124996. https://www.osti.gov/servlets/purl/10124996.
@article{osti_10124996,
title = {Hospital waste shredder test series at the DONLEE Pilot Test Facility. Final report},
author = {},
abstractNote = {This report describes the coal firing and coal and noninfectious hospital waste co-firing testing and emissions rates for the tests conducted at the DONLEE pilot plant facility during mid-December 1991 through early March 1992. The emissions obtained during these tests are in turn used to predict the emission rates for the proof-of-concept facility that is to be built at the Lebanon Veterans Affairs Medical Center. In addition, the reliability and performance of the waste shredding/feeding system were evaluated from this testing.},
doi = {10.2172/10124996},
url = {https://www.osti.gov/biblio/10124996}, journal = {},
number = ,
volume = ,
place = {United States},
year = {1992},
month = {9}
}