Intelligent distributed control for nuclear power plants. Final (third annual) technical progress report, September 1991--June 1993 (September 1989--June 1993): Includes no-cost extension period from September 1992--June 1993
Abstract
This project was initiated in September 1989 as a three year project to develop and demonstrate Intelligent Distributed Control (IDC) for Nuclear Power Plants. There were two primary goals of this research project. The first goal was to combine diagnostics and control to achieve a highly automated power plant as described by M.A. Schultz. The second goal was to apply this research to develop a prototype demonstration on an actual power plant system, the EBR-2 steam plant. Described in this Final (Third Annual) Technical Progress Report is the accomplishment of the project`s final milestone, an in-plant intelligent control experiment conducted on April 1, 1993. The development of the experiment included: simulation validation, experiment formulation and final programming, procedure development and approval, and experimental results. Other third year developments summarized in this report are: (1) a theoretical foundation for Reconfigurable Hybrid Supervisory Control, (2) a steam plant diagnostic system, (3) control console design tools and (4) other advanced and intelligent control.
- Authors:
- Publication Date:
- Research Org.:
- Pennsylvania State Univ., University Park, PA (United States). Coll. of Engineering
- Sponsoring Org.:
- USDOE, Washington, DC (United States)
- OSTI Identifier:
- 10118397
- Report Number(s):
- DOE/ER/12889-18
ON: DE94005856; BR: KE0103000/KV0200000; TRN: 94:002307
- DOE Contract Number:
- FG02-89ER12889
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: [1993]
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 22 GENERAL STUDIES OF NUCLEAR REACTORS; NUCLEAR POWER PLANTS; REACTOR CONTROL SYSTEMS; EBR-2 REACTOR; RESEARCH PROGRAMS; ARTIFICIAL INTELLIGENCE; COMPUTERIZED CONTROL SYSTEMS; DIAGNOSTIC TECHNIQUES; DEMONSTRATION PROGRAMS; CONSOLES; REACTOR SIMULATORS; PROGRESS REPORT; 220400; 220600; CONTROL SYSTEMS; RESEARCH, TEST, TRAINING, PRODUCTION, IRRADIATION, MATERIALS TESTING REACTORS
Citation Formats
Klevans, E.H. Intelligent distributed control for nuclear power plants. Final (third annual) technical progress report, September 1991--June 1993 (September 1989--June 1993): Includes no-cost extension period from September 1992--June 1993. United States: N. p., 1993.
Web. doi:10.2172/10118397.
Klevans, E.H. Intelligent distributed control for nuclear power plants. Final (third annual) technical progress report, September 1991--June 1993 (September 1989--June 1993): Includes no-cost extension period from September 1992--June 1993. United States. doi:10.2172/10118397.
Klevans, E.H. Fri .
"Intelligent distributed control for nuclear power plants. Final (third annual) technical progress report, September 1991--June 1993 (September 1989--June 1993): Includes no-cost extension period from September 1992--June 1993". United States.
doi:10.2172/10118397. https://www.osti.gov/servlets/purl/10118397.
@article{osti_10118397,
title = {Intelligent distributed control for nuclear power plants. Final (third annual) technical progress report, September 1991--June 1993 (September 1989--June 1993): Includes no-cost extension period from September 1992--June 1993},
author = {Klevans, E.H.},
abstractNote = {This project was initiated in September 1989 as a three year project to develop and demonstrate Intelligent Distributed Control (IDC) for Nuclear Power Plants. There were two primary goals of this research project. The first goal was to combine diagnostics and control to achieve a highly automated power plant as described by M.A. Schultz. The second goal was to apply this research to develop a prototype demonstration on an actual power plant system, the EBR-2 steam plant. Described in this Final (Third Annual) Technical Progress Report is the accomplishment of the project`s final milestone, an in-plant intelligent control experiment conducted on April 1, 1993. The development of the experiment included: simulation validation, experiment formulation and final programming, procedure development and approval, and experimental results. Other third year developments summarized in this report are: (1) a theoretical foundation for Reconfigurable Hybrid Supervisory Control, (2) a steam plant diagnostic system, (3) control console design tools and (4) other advanced and intelligent control.},
doi = {10.2172/10118397},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Dec 31 00:00:00 EST 1993},
month = {Fri Dec 31 00:00:00 EST 1993}
}
-
This project was initiated in September 1989 as a three year project to develop and demonstrate Intelligent Distributed Control (IDC) for Nuclear Power Plants. The body of this Third Annual Technical Progress report summarizes the period from September 1991 to October 1992. There were two primary goals of this research project. The first goal was to combine diagnostics and control to achieve a highly automated power plant as described by M.A. Schultz. His philosophy, is to improve public perception of the safety of nuclear power plants by incorporating a high degree of automation where a greatly simplified operator control consolemore »
-
Intelligent distributed control for nuclear power plants. Second annual technical progress report, September 1990--September 1991
In September of 1989 work began on the DOE University Program grant DE-FG07-89ER12889. The grant provides support for a three year project to develop and demonstrate Intelligent Distributed Control (IDC) for Nuclear Power Plants. The body of this Second Annual Technical Progress report covers the period from September 1990 to September 1991. It summarizes the second year accomplishments while the appendices provide detailed information presented at conference meetings. These are two primary goals of this research. The first is to combine diagnostics and control to achieve a highly automated power plant as described by M.A. Schultz, a project consultant duringmore » -
Modeling of integrated environmental control systems for coal-fired power plants. Technical progress report, [June 1, 1989--September 30, 1989]
The general goal of this research project is to enhance, and transfer to DOE, a new computer simulation model for analyzing the performance and cost of environmental control systems for coal-fired power plants. Systems utilizing pre-combustion, combustion, or post-combustion control methods, individually or in combination, may be considered. A unique capability of this model is the probabilistic representation of uncertainty in model input parameters. This stochastic simulation capability allows the performance and cost of environmental control systems to be quantified probabilistically, accounting for the interactions among all uncertain process and economic parameters. This method facilitates more rigorous comparisons between conventionalmore » -
Department of Defense Nuclear/Biological/Chemical (NBC) warfare defense. Annual report to Congress, June 1994. Final report, 1 October 1992-30 September 1993
The National Defense Authorization Act for Fiscal Year 1994, Public Law 103-160, Title XVII, Chemical and Biological Weapons Defense, section 1703, directed the Secretary of Defense to submit an assessment and a description of plans to improve readiness. The DoD objective is to enable our forces to survive, fight and win in NBC contaminated environments. Discussed are new management objectives impacted by declining resources and force structure versus an ever changing threat environment. Nuclear biological, Chemical, NBC, Defense, Logistics, Readiness, Training, Contamination avoidance, Protection, Decontamination. -
Enhancing nuclear power plant performance through the use of artificial intelligence. Final (third annual) report, June 1, 1990--March 31, 1992: Part 1, Overview and publications
The objective of this research was to advance the state-of-the-art of applying artificial intelligence technology (both expert systems and neural networks) to enhancing the performance (safety, efficiency, control and management) of nuclear power plants. A second, but equally important objective, was to build a broadly based critical mass of expertise in the artificial intelligence field that can be brought to bear on the technology of nuclear power plants.