This model defines the methods used to estimate the cost associated with acquisition and installation of capital equipment of the fuel cell systems defined by the central utility plant model. The capital cost model estimates the cost of acquiring and installing the fuel cell unit, and all auxiliary equipment such as a boiler, air conditioning, hot water storage, and pumps. The model provides a means to adjust initial cost estimates to consider learning associated with the projected level of production and installation of fuel cell systems. The capital cost estimate is an input to the cost of ownership analysis where it is combined with operating cost and revenue model estimates.

Research Organization:
Southern California Gas Co., Los Angeles, CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
FC21-92MC29227
OSTI ID:
10117460
Report Number(s):
DOE/MC/29227-3538; ON: DE94000064; BR: AA4535000
Resource Relation:
Other Information: PBD: 30 Jun 1993
Country of Publication:
United States
Language:
English