Title: Geophysical investigation of the SQ Tanks, 221-T Building, 200 West Area

Abstract

The SQ Tanks are located on the northwest side of the 221-T plant, in the 200-West Area of the Hanford Reservation. The objective of the survey was to locate subsurface obstructions that may affect the removal of tanks and supporting structures. Based upon the results of the survey, obstructions and linears were identified. Access was limited in the survey area due to structures, buildings, and construction work.

Authors:
Publication Date:
Research Org.:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10116870
Report Number(s):
WHC-SD-EN-TI-223
ON: DE95005640; TRN: 95:001727
DOE Contract Number:
AC06-87RL10930
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: [1995]
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 58 GEOSCIENCES; TANKS; REMOVAL; HANFORD RESERVATION; GEOPHYSICAL SURVEYS; SITE CHARACTERIZATION; RADIOACTIVE WASTES; UNDERGROUND STORAGE; RADIOACTIVE WASTE STORAGE; 052002; 580000; WASTE DISPOSAL AND STORAGE; GEOSCIENCES

Citation Formats

Mitchell, T.H.. Geophysical investigation of the SQ Tanks, 221-T Building, 200 West Area. United States: N. p., 1995. Web. doi:10.2172/10116870.
Mitchell, T.H.. Geophysical investigation of the SQ Tanks, 221-T Building, 200 West Area. United States. doi:10.2172/10116870.
Mitchell, T.H.. Sun . "Geophysical investigation of the SQ Tanks, 221-T Building, 200 West Area". United States. doi:10.2172/10116870. https://www.osti.gov/servlets/purl/10116870.
@article{osti_10116870,
title = {Geophysical investigation of the SQ Tanks, 221-T Building, 200 West Area},
author = {Mitchell, T.H.},
abstractNote = {The SQ Tanks are located on the northwest side of the 221-T plant, in the 200-West Area of the Hanford Reservation. The objective of the survey was to locate subsurface obstructions that may affect the removal of tanks and supporting structures. Based upon the results of the survey, obstructions and linears were identified. Access was limited in the survey area due to structures, buildings, and construction work.},
doi = {10.2172/10116870},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Jan 01 00:00:00 EST 1995},
month = {Sun Jan 01 00:00:00 EST 1995}
}

Technical Report:

Save / Share:
  • Ground-penetrating radar was used at three locations in an attempt to locate and determine the depth of the 216-U-1/2 pipeline. Many anomalies were found, all very useful to the project, but only some of which were identified with the pipeline.
  • Two geophysical surveys were conducted over a vitrified clay pipeline (VCP) that was used to transfer liquid radioactive waste from the 224-U Building to the 216-U-8 and 216-U-12 cribs. The objectives of the surveys were to locate the VCP in the northern site, locate the bends in the VCP in the southern site, and locate possible utilities or pipelines at both sites. Ground-penetrating radar (GPR) was the method chosen for the surveys. Electromagnetic induction (EMI) was also used at the southern site to map the extent of a possible pipeline. It is very difficult to detect most VCPs with GPR,more » however, excavation boundaries for the pipeline are often discernible. The VCP was not identified in the GPR data at the northern site. Its anticipated depth was 10--12 ft. The VCP at the southern site appears to be much shallower. The data suggest it may be 5 ft or less below the surface in places. The edges of the excavation from N100 to N190 are between E120 and E135 and were quite distinct in the data. However, the excavation boundaries weren`t apparent north of N190, suggesting that the VCP bends to the north near N200. Several profiles were extended beyond N200. These profiles detected a linear, with the characteristic signature of a pipeline, approximately 3 ft below the surface. There was no previous knowledge of the pipeline. The linear was traced across the entire surface contamination area with an EMI geophysical tool.« less
  • This report contains the results of a geophysical investigation conducted to characterize Trench 4, located in Burial Ground 218-W-4C, 200 West Area. Trench 4 is where transuranic (TRU) waste is stored. The primary objective of these geophysical investigations was to determine the outer edges of the trench/modules and select locations for plate-bearing tests. The test locations are to be 5 to 8 ft. beyond the edges of the trench. Secondary objectives include differentiating between the different types of waste containers within a given trench, determining the amount of soil cover over the waste containers, and to locate the module boundaries.more » Ground-penetrating radar (GPR) and electromagnetic induction (EMI) were the methods selected for this investigation.« less
  • This letter report is a supplement to the letter reports submitted previously under ECRs No. 2002-600-012 (Borrow Area C) and No. 2002-600-012a (CWC expansion). This letter report covers all areas that may be subject to surface disturbance under Alternative Groups A, B, C, D1, D2, D3, E1, E2, E3, and the No Action Alternative of the Hanford Solid Waste Environmental Impact Statement (HSW EIS), except for the following Low-Level Burial Grounds (LLBGs). The LLBGs proposed for use in the HSW EIS that are not subject of this letter report (218-W-3A, 218-W-3AE, 218-W 4B, 218-W-5, the developed portion of 218-W-4C, andmore » the eastern half [except the northeastern corner] of 218-W-6 in the 200 West Area; and 218-E-10 and 218-E-12B in the 200 East Area) are surveyed annually. Annual letter reports concerning these are currently sent to Mr. Brett M. Barnes of Fluor Hanford, Inc. For the areas of surface disturbance described herein we provide a summary of field survey methods, survey results, and considerations and recommendations based on these results.« less
  • The now HB-Line is located an top of the 221-H Building on the fifth and sixth levels and is designed to replace the aging existing HB-Line production facility. The new HB-Line consists of three separate facilities: the Scrap Recovery Facility, Neptunium Facility, and Plutonium Oxide Facility. The Scrap Recovery Facility is designed to routinely generate nitrate solutions of {sup 235}U{sup 239}Pu and Pu-238 fromscrap for purification by anion exchange or by solvent extraction in the canyon. The now facility incorporates improvements in: (1) engineered controls for nuclear criticality, (2) cabinet integrity and engineered barriers to contain contamination and minimize personnelmore » exposure to airborne contamination, (3) shielding and remote operations to decrease radiation exposure, and (4) equipment and ventilation design to provide flexibility and improved process performance.« less