Title: T Plant removal of PWR Chiller Subsystem

Abstract

The PWR Pool Chiller System is not longer required for support of the Shippingport Blanket Fuel Assemblies Storage. The Engineering Work Plan will provide the overall coordination of the documentation and physical changes to deactivate the unneeded subsystem. The physical removal of all energy sources for the Chiller equipment will be covered under a one time work plan. The documentation changes will be covered using approved Engineering Change Notices and Procedure Change Authorizations as needed.

Authors:
Publication Date:
Research Org.:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10116734
Report Number(s):
WHC-SD-WM-WP-293
ON: DE95005072; TRN: 95:001682
DOE Contract Number:
AC06-87RL10930
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 15 Dec 1994
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; HANFORD RESERVATION; RADIOACTIVE WASTE MANAGEMENT; FUEL STORAGE POOLS; RETROFITTING; SPENT FUEL STORAGE; DESIGN; SHIPPINGPORT REACTOR; 050900; 210200; TRANSPORT, HANDLING, AND STORAGE; POWER REACTORS, NONBREEDING, LIGHT-WATER MODERATED, NONBOILING WATER COOLED

Citation Formats

Dana, C.M.. T Plant removal of PWR Chiller Subsystem. United States: N. p., 1994. Web. doi:10.2172/10116734.
Dana, C.M.. T Plant removal of PWR Chiller Subsystem. United States. doi:10.2172/10116734.
Dana, C.M.. Thu . "T Plant removal of PWR Chiller Subsystem". United States. doi:10.2172/10116734. https://www.osti.gov/servlets/purl/10116734.
@article{osti_10116734,
title = {T Plant removal of PWR Chiller Subsystem},
author = {Dana, C.M.},
abstractNote = {The PWR Pool Chiller System is not longer required for support of the Shippingport Blanket Fuel Assemblies Storage. The Engineering Work Plan will provide the overall coordination of the documentation and physical changes to deactivate the unneeded subsystem. The physical removal of all energy sources for the Chiller equipment will be covered under a one time work plan. The documentation changes will be covered using approved Engineering Change Notices and Procedure Change Authorizations as needed.},
doi = {10.2172/10116734},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Dec 15 00:00:00 EST 1994},
month = {Thu Dec 15 00:00:00 EST 1994}
}

Technical Report:

Save / Share: