Work plan for upgrade of SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control System (DACS-1)
The purpose of this effort is to upgrade the existing DACS-1 used for control and data acquisition in support of the hydrogen mitigation program for tank 101-SY. The planned upgrades will enhance the system capabilities to support additional mitigation projects and improve the system operability by implementing changes identified during operation of the system to date. Once the upgrades have been implemented, the DACS-1 system should operate as it did prior to the upgrade, but with greatly increased speed and capability. No retraining of Test Engineers will be required; the upgrade is designed to be transparent to those who operate it, with only a noticeable increase in the speed of the system. This work plan defines the tasks required for implementing the upgrade. It identifies deliverables, responsible organizations and individuals, interfaces, and schedule. This upgrade effort employs system engineering principles wherever applicable.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10110578
- Report Number(s):
- WHC-SD-WM-WP-284; ON: DE95004971; BR: 35AF11201/35AF11202
- Resource Relation:
- Other Information: PBD: Aug 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
Computer system requirements specification for 101-SY hydrogen mitigation test project data acquisition and control system (DACS-1)
System design description for SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)