skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993

Abstract

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.

Authors:
Publication Date:
Research Org.:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10109079
Report Number(s):
DOE/RL-93-56-2
ON: DE94004496; BR: 35AF11201/35AF11202
DOE Contract Number:
AC06-87RL10930
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Oct 1993
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; GROUND WATER; MONITORING; CHEMICAL EFFLUENTS; EMISSION; RADIOACTIVE EFFLUENTS; HANFORD RESERVATION; COMPILED DATA; CHEMICAL COMPOSITION; COLIFORMS; RADIOCHEMICAL ANALYSIS; HAZARDOUS MATERIALS; PROGRESS REPORT; 540250; 540230; 540220; SITE RESOURCE AND USE STUDIES; RADIOACTIVE MATERIALS MONITORING AND TRANSPORT; CHEMICALS MONITORING AND TRANSPORT

Citation Formats

Jungers, D.K.. Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993. United States: N. p., 1993. Web. doi:10.2172/10109079.
Jungers, D.K.. Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993. United States. doi:10.2172/10109079.
Jungers, D.K.. Fri . "Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993". United States. doi:10.2172/10109079. https://www.osti.gov/servlets/purl/10109079.
@article{osti_10109079,
title = {Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993},
author = {Jungers, D.K.},
abstractNote = {Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.},
doi = {10.2172/10109079},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Oct 01 00:00:00 EDT 1993},
month = {Fri Oct 01 00:00:00 EDT 1993}
}

Technical Report:

Save / Share:
  • Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA) (EPA 1986a); 40 CFR 265, Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (EPA 1988b). This submittal provides data obtained from groundwater monitoring activities for April 1, 1990 through June 30, 1990. 18 refs., 20 figs., 34 tabs.
  • Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or ground water quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and 40 CFR 265, Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (EPA 1989). Compliance with the 40 CFR 265 regulations are required by the Washington Administrative Code 173--303 (Ecology 1991). This submittal provides data obtained from groundwater monitoring activities for April 1, 1991 through June 30, 1991. 12 refs., 1 fig., 12 tabs.
  • Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and ``Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities,`` as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company manages RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management,more » specifying data needs, performing quality control oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. This quarterly report contains data received between May 20 and August 19, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the April through June quarter but also data from earlier sampling events that were not previously reported.« less
  • Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and 40 CFR 265, Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (EPA 1991a). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303 (Ecology 1991). This report contains data from Hanford Site groundwater monitoring projects.
  • Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and 40 CFR 265, Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (EPA 1991a). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303 (Ecology 1991). This report contains data from Hanford Site groundwater monitoring projects.