Seismic qualification of a switch box
Abstract
This supporting document details the results of a seismic analysis on a switch box assembly. The switch box is mounted to a Unistrut frame and is attached to the concrete floor in the 225B Building with Hilti Kwik bolts. The assembly was found to meet safety class 3 requirement. Although all components analyzed were found to be structurally adequate, some changes are recommended. To comply with SDC 4.2 specification, the Hilti Kwik bolts should be: placed at least 8 1/4 inches from the edge of the concrete floor; should have a minimum spacing of 8 inches from any Kwik bolt; and should be embedded 5 1/2 inches into the concrete. The minimum embedment distance is 2 3/4 inches. Furthermore, when the bolts are installed, rebar within the concrete should not be cut or damaged. Finally, the length of the Hilti Kwik bolt should be sized such that the distance from the top of the bolt to the top of the nut is not less than 2 thread pitches, and not more that 3/4 inch.
- Authors:
- Publication Date:
- Research Org.:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Org.:
- USDOE, Washington, DC (United States)
- OSTI Identifier:
- 10105536
- Report Number(s):
- WHC-SD-WM-ER-393
ON: DE95004365; BR: 35AF11201/35AF11202; TRN: AHC29503%%47
- DOE Contract Number:
- AC06-87RL10930
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 23 Nov 1994
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; HANFORD RESERVATION; RADIOACTIVE WASTE FACILITIES; SWITCHING CIRCUITS; SAFETY ANALYSIS; SEISMIC EFFECTS; SEISMIC ISOLATION; RECOMMENDATIONS; MODIFICATIONS; 054000; 052001; HEALTH AND SAFETY; WASTE PROCESSING
Citation Formats
Miller, S.M. Seismic qualification of a switch box. United States: N. p., 1994.
Web. doi:10.2172/10105536.
Miller, S.M. Seismic qualification of a switch box. United States. doi:10.2172/10105536.
Miller, S.M. Wed .
"Seismic qualification of a switch box". United States.
doi:10.2172/10105536. https://www.osti.gov/servlets/purl/10105536.
@article{osti_10105536,
title = {Seismic qualification of a switch box},
author = {Miller, S.M.},
abstractNote = {This supporting document details the results of a seismic analysis on a switch box assembly. The switch box is mounted to a Unistrut frame and is attached to the concrete floor in the 225B Building with Hilti Kwik bolts. The assembly was found to meet safety class 3 requirement. Although all components analyzed were found to be structurally adequate, some changes are recommended. To comply with SDC 4.2 specification, the Hilti Kwik bolts should be: placed at least 8 1/4 inches from the edge of the concrete floor; should have a minimum spacing of 8 inches from any Kwik bolt; and should be embedded 5 1/2 inches into the concrete. The minimum embedment distance is 2 3/4 inches. Furthermore, when the bolts are installed, rebar within the concrete should not be cut or damaged. Finally, the length of the Hilti Kwik bolt should be sized such that the distance from the top of the bolt to the top of the nut is not less than 2 thread pitches, and not more that 3/4 inch.},
doi = {10.2172/10105536},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Nov 23 00:00:00 EST 1994},
month = {Wed Nov 23 00:00:00 EST 1994}
}
-
The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 2 presents a general method for correlating the severity of one seismic qualification motion of given dynamic characteristics to another motion, possibly of different dynamic characteristics. The method provides a method of measuring relative damage severity of two different motions in terms of a relative damage severity ratio.
-
Program plan for environmental qualification of mechanical and dynamic (including seismic) qualification of mechanical and electrical equipment program (EDQP)
The equipment qualification program described in this plan is intended to provide the technical basis for resolving uncertainties in existing equipment qualification standards. In addition, research results are contributing to the resolution of safety issues GI-23, GI-87, USI-A44, titled, ''Reactor Coolant Pump Seal Failure,'' ''Failure of HPCI Steam Line Without Isolation,'' and ''Station Blackout,'' respectively. Also, research effort is being directed at providing information on the behavior of containment isolation valves under severe accident environments. Although the results of the latter research will not contribute to resolving uncertainties in qualification standards, it has proven cost effective to obtain this informationmore » -
Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 3. Recommendations for improvement of equipment qualification methodology and criteria. Volume 3
The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 3 presents recommendations for improvement of equipment qualification methodology and procedural clarification/modification. The fifth category identifies issues where adequate information does not exist to allow a recommendation to be made. -
Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Part I. Survey of methods for equipment and components. Part II. Evaluation of methodology. Part III. Qualification methodology for line mounted equipment. Volume 1
The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 1 comprises three parts. Part I reviews the methods currently utilized for seismic qualification of nuclear plant equipment with emphasis on qualification by testing. In this review various anomalies that are associated with qualification are identified. Part II provides an in-depth evaluation of the technical issues/anomalies previously identified. Part III providesmore »