Abstract

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Authors:
Publication Date:
Research Org.:
Eastern Illinois University
Sponsoring Org.:
USDOE
OSTI Identifier:
1004555
DOE Contract Number:  
FC26-08NT0005389
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English

Citation Formats

Reed, Gary. Power Plant Replacement Study. United States: N. p., 2010. Web. doi:10.2172/1004555.
Reed, Gary. Power Plant Replacement Study. United States. https://doi.org/10.2172/1004555
Reed, Gary. 2010. "Power Plant Replacement Study". United States. https://doi.org/10.2172/1004555. https://www.osti.gov/servlets/purl/1004555.
@article{osti_1004555,
title = {Power Plant Replacement Study},
author = {Reed, Gary},
abstractNote = {This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.},
doi = {10.2172/1004555},
url = {https://www.osti.gov/biblio/1004555}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Sep 30 00:00:00 EDT 2010},
month = {Thu Sep 30 00:00:00 EDT 2010}
}