skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: DARHT status and preparations for dual-axis hydrotesting (u)

Journal Article ·
OSTI ID:1000926
 [1]
  1. Los Alamos National Laboratory

The status of the DARHT facility, including a history of events that have taken place since the end of the DARHT Second Axis Refurbishment Project, is discussed. Technical and operational enhancements that have been made will be addressed, and recent technical challenges, such as the RF noise in the kicker region, are discussed. Historical data on reliability of the second axis is discussed, as well as operational changes made to enhance reliability. In addition, the path forward for integrating the second axis into overall DARHT operations in preparation for a hydrotest is addressed. Timing integration tests are accompanied by a series of tests to evaluate neutron contamination and cross-axis scatter, with attempts being made to provide adequate shielding to minimize the effects of neutrons and cross-beam scatter. The discussion includes results of the testing performed to-date, and concludes with a discussion of the path forward for dual-axis hydrotesting at DARHT.

Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC52-06NA25396
OSTI ID:
1000926
Report Number(s):
LA-UR-10-01624; LA-UR-10-1624; TRN: US1100260
Country of Publication:
United States
Language:
English