Minutes
STIP Managers
Teleconference
September 14, 2005
Scheduling of STI records (Sharon
Jordan): OSTI is working on scheduling STI records with NARA, and they have met with the NARA representative on several
occasions. The NARA
representative has also made visits to some DOE sites. While OSTI is
working with NARA
on its (OSTI’s) records schedule, the STI records in the hands of the DOE
contractors will also be affected. The results of these discussions will
be put into the STI Guide when it is resolved.
LOWG (Sharon
Jordan): The DOE Library Operations Working Group (LOWG) is
meeting at ORNL in October. If you are in town and free Thursday and/or
Thursday night, OSTI will be available to meet with you. Perhaps a dinner
for Thursday could be arranged. Let OSTI know if you are interested.
DOIs (Sharon
Jordan): The IT staff at OSTI are working to get DOE digital
object indicators (DOIs) into the CrossRef system. However, CrossRef is
not yet ready to do this. It looks to be late October this year before
CrossRef can handle DOE DOIs.
Location of STI at Sites (Sharon
Jordan): For all new documents, OSTI is downloading documents
hosted by the sites when URLs are provided for the documents. This
process only pertains to new documents; getting past documents is something to
be decided in the future. This service is the result of NARA’s desire to have one place to go for
DOE’s STI (see item1 above). However,
documents hosted by the sites that are announced on the Information Bridge,
ECD, and SRC will still link to the URLs provided by the sites.
“Stuck” documents (Sharon
Jordan): The new system will compile site lists of “stuck”
documents and identify them by site; the list will be sent to the site’s
primary point of contact, or you can use the report-generating feature of the
system to see your list. When you use harvesting, you’ll get a “didn’t
work” prompt at the time of harvesting.
E-Link old records (Sharon
Jordan): If you have any problems with old records that were
put into E-link earlier (editing them, etc.), contact OSTI.
E-link discussion (Kathy
Waldrop, Patty Simmons, Jannean Elliott, Sharon Jordan):
- There can be more than one
releasing official per site.
- Updates are made daily at about
8:00 pm EST to allow West Coast site to keep working during their normal business
hours.
- The “Proxy Error” message is a
bug that hasn’t yet been fixed. If you get this or another error, please
provide a screen capture of the error and e-mail that along with the time
of day when the error occurred and send these to OSTI.
- Items over 5000 kilobytes time
out after six minutes in the experience of one site.
- There have been a few bugs;
they are fixed as they are reported or otherwise identified, such as,
sorting by field is now working, and user names have to be unique.
- The automated harvesting runs
have not been done because OSTI wants to first make sure that the system
is working properly.
- Harvesting tests run have been
encouraging, and harvesting will resume soon. This week’s runs are
manual to allow OSTI to look at them first. Next week we may see the
resumption of harvesting.
Miscellaneous (All):
- There
is nothing new on the spring STIP meeting. It will be in Chicago in late
April.
- Mina
Perrin at the Savannah River Operations Office is retiring after forty
years.
- SLAC
has a job for a publications manager posted on its Web site.
Interested parties should check it out.
- There
is a draft version of DOE’s Applied Technology handling instructions in
the works. The 2000 version is the most current version.
- OSTI
will accept presentations as STI; whether Power Points are considered to
be STI is normally left up to the submitting sites.
- The
next STIP Managers teleconference will be held November 9.