SECONDARY WASTE/ETF (EFFLUENT TREATMENT FACILITY) PRELIMINARY PRE-CONCEPTUAL ENGINEERING STUDY
This pre-conceptual engineering study is intended to assist in supporting the critical decision (CD) 0 milestone by providing a basis for the justification of mission need (JMN) for the handling and disposal of liquid effluents. The ETF baseline strategy, to accommodate (WTP) requirements, calls for a solidification treatment unit (STU) to be added to the ETF to provide the needed additional processing capability. This STU is to process the ETF evaporator concentrate into a cement-based waste form. The cementitious waste will be cast into blocks for curing, storage, and disposal. Tis pre-conceptual engineering study explores this baseline strategy, in addition to other potential alternatives, for meeting the ETF future mission needs. Within each reviewed case study, a technical and facility description is outlined, along with a preliminary cost analysis and the associated risks and benefits.
- Research Organization:
- Hanford Site (HNF), Richland, WA (United States)
- Sponsoring Organization:
- USDOE Assistant Secretary for Environmental Management (EM)
- DOE Contract Number:
- DE-AC27-08RV14800
- OSTI ID:
- 969759
- Report Number(s):
- RPP-RPT-43588 Rev 0; EDT-823422; TRN: US1000699
- Country of Publication:
- United States
- Language:
- English
Similar Records
Acetonitrile Destruction in ETF Feed Solutions by UV/OX and Persulfate (Final Report)
New Formulation of Cast Stone for {sup 99}Tc Immobilization in Sulfate Rich Secondary Waste Stream - 16098