Geotechnical Analysis Report for July 2004 - June 2005, Volume 2, Supporting Data
This report is a compilation of geotechnical data presented as plots for each active instrument installed in the underground at the Waste Isolation Pilot Plant (WIPP) through June 30, 2005. A summary of the geotechnical analyses that were performed using the enclosed data is provided in Volume 1 of the Geotechnical Analysis Report (GAR).
- Research Organization:
- Waste Isolation Pilot Plant (WIPP), Carlsbad, NM
- Sponsoring Organization:
- USDOE - Office of Environmental Management (EM)
- DOE Contract Number:
- AC29-01AL66444
- OSTI ID:
- 926086
- Report Number(s):
- DOE/WIPP-06-3177, Volume 2; TRN: US1001878
- Resource Relation:
- Related Information: Supplement Document to DOE/WIPP-06-3177, Volume 1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2005 - June 2006, Volume 2, Supporting Data
Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2004 - June 2005, Volume 1
Geotechnical Analysis Report for July 2006 - June 2007 - Supporting Data
Technical Report
·
Sun Mar 25 00:00:00 EDT 2007
·
OSTI ID:926086
Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2004 - June 2005, Volume 1
Technical Report
·
Mon Apr 03 00:00:00 EDT 2006
·
OSTI ID:926086
Geotechnical Analysis Report for July 2006 - June 2007 - Supporting Data
Technical Report
·
Mon Mar 31 00:00:00 EDT 2008
·
OSTI ID:926086
Related Subjects
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
WIPP
HALITE
DOLOMITE
HAZARDOUS MATERIALS
GIS
geomechanical instrumentation system
marker bed
remote-handled
contact-handled
Hazardous Waste Facility Permit
system design description
site and preliminary design validation
transuranic
TRU
Waste Isolation Pilot Plant
shaft
geological
R&D
mixed waste
creep closure
deformation
displacement
evaporite
anhydrite
halite
gypsiferous
dolomite
mudstone
redbeds
excavation
undulates
embedment
rock bolts
piezometers
concentrate
catch basin
seepage
stratigraphy
borehole
convergence
repository
deterioration
scaling
trimming
WIPP
HALITE
DOLOMITE
HAZARDOUS MATERIALS
GIS
geomechanical instrumentation system
marker bed
remote-handled
contact-handled
Hazardous Waste Facility Permit
system design description
site and preliminary design validation
transuranic
TRU
Waste Isolation Pilot Plant
shaft
geological
R&D
mixed waste
creep closure
deformation
displacement
evaporite
anhydrite
halite
gypsiferous
dolomite
mudstone
redbeds
excavation
undulates
embedment
rock bolts
piezometers
concentrate
catch basin
seepage
stratigraphy
borehole
convergence
repository
deterioration
scaling
trimming