Design considerations for fast-cycling superconducting accelerator magnets of 2 T B-field generated by a transmission line conductor of up to 100 kA current
Conference
·
OSTI ID:917078
Recently proposed synchrotrons, SF-SPS at CERN and DSF-MR at Fermilab, would operate with a 0.5 Hz cycle (or 2 second time period) while accelerating protons to 480 GeV. We examine possibilities of superconducting magnet technology that would allow for an accelerator quality magnetic field sweep of 2 T/s. For superconducting magnets the cryogenic cooling power demand due to AC losses in the superconductor leads to a high operational cost. We outline a novel magnet technology based on HTS superconductors that may allow to reduce AC losses in the magnet coil possibly up to an order of magnitude as compared to similar applications based on LTS type superconductors.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 917078
- Report Number(s):
- FERMILAB-CONF-07-431-AD; TRN: US0804431
- Resource Relation:
- Conference: Presented at 20th International Conference on Magnet Technology (MT20), Philadelphia, Pennsylvania, 27-31 Aug 2007
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design considerations of a pair of power leads for fast-cycling superconducting accelerator magnets operating at 2 Tesla and 100 kA
Design considerations of a power supply system for fast cycling superconducting accelerator magnets of 2 Tesla b-field generated by a conductor of 100 kA current
Preliminary consideration of a double, 480 GeV, fast cycling proton accelerator for production of neutrino beams at Fermilab
Conference
·
Wed Aug 01 00:00:00 EDT 2007
·
OSTI ID:917078
+2 more
Design considerations of a power supply system for fast cycling superconducting accelerator magnets of 2 Tesla b-field generated by a conductor of 100 kA current
Conference
·
Fri Jun 01 00:00:00 EDT 2007
·
OSTI ID:917078
+1 more
Preliminary consideration of a double, 480 GeV, fast cycling proton accelerator for production of neutrino beams at Fermilab
Technical Report
·
Thu Mar 01 00:00:00 EST 2007
·
OSTI ID:917078