Title: OVERVIEW OF THE AGS COLD SNAKE POWER SUPPLIES AND THE NEW RHIC SEXTUPOLE POWER SUPPLIES

Conference ·
OSTI ID:910396

The two rings in the Relativistic Heavy Ion Collider (RHIC) were originally constructed with 24 sextupole power supplies, 12 for each ring. Before the start of Run 7, 24 new sextupole power supplies were installed, 12 for each ring. Individual sextupole power supplies are now each connected to six sextupole magnets. A superconducting snake magnet and power supplies were installed in the Alternating Gradient Synchrotron (AGS) and commissioned during RHIC Run 5, and used operationally in RHIC Run 6. The power supply technology, connections, control systems and interfacing with the Quench Protection system for both these systems will be presented.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States)
Sponsoring Organization:
Doe - Office Of Science
DOE Contract Number:
DE-AC02-98CH10886
OSTI ID:
910396
Report Number(s):
BNL-77513-2007-CP; R&D Project: 18037; TRN: US0704195
Resource Relation:
Conference: 22ND PARTICLE ACCELERATOR CONFERENCE; ALBUQUERQUE, NEW MEXICO; 20070625 through 20070629
Country of Publication:
United States
Language:
English