Title: Review of potential EGS sites and possible EGS demonstration scenarios

Abstract

Review of potential sites for Enhanced Geothermal Systems (EGS) and development of reference scenarios for EGS demonstration projects are two sub-tasks included in the FY 1999 EGS Research and Development (R&D) Management Task (DOE Task Order Number DE-AT07-99ID60365, included in the Appendix of this report). These sub-tasks are consistent with the EGS Strategic Plan, which includes milestones relating to EGS site selection (Milestone 4, to be completed in 2004) and development of a cost-shared, pilot-scale demonstration project (Milestone 5, to be completed in 2008). The purpose of the present work is to provide some reference points for discussing what type of EGS projects might be undertaken, where they might be located, and what the associated benefits are likely to be. The review of potential EGS sites is presented in Chapter 2 of this report. It draws upon site-selection criteria (and potential project sites that were identified using those criteria) developed at a mini-workshop held at the April 1998 DOE Geothermal Program Review to discuss EGS R&D issues. The criteria and the sites were the focus of a paper presented at the 4th International Hot Dry Rock Forum in Strasbourg in September 1998 (Sass and Robertson-Tait, 1998). The selection criteria, projectmore » sites and possible EGS developments discussed in the workshop and paper are described in more detail herein. Input from geothermal operators is incorporated, and water availability and transmission-line access are emphasized. The reference scenarios for EGS demonstration projects are presented in Chapter 3. Three alternative scenarios are discussed: (1) a stand-alone demonstration plant in an area with no existing geothermal development; (2) a separate generating facility adjacent to an existing geothermal development; and (3) an EGS project that supplies an existing geothermal power plant with additional generating capacity. Furthermore, information potentially useful to DOE in framing solicitations and selecting projects for funding is discussed objectively. Although defined as separate sub-tasks, the EGS site review and reference scenarios are closely related. The incremental approach to EGS development that has recently been adopted could logically be expected to yield proposals for studies that lead up to and include production-enhancement experiments in producing geothermal fields in the very near future. However, the strategic plan clearly calls for the development of a more comprehensive demonstration project that can generate up to perhaps 10 MW (gross). It is anticipated that a series of small-scale experiments will define what realistically may be achieved in the near future, thus setting the stage for a successful pilot demonstration. This report continues the process of presenting information on EGS sites and experiments, and begins the process of defining what a demonstration project might be.« less

Publication Date:
Research Org.:
GeothermEx, Inc., Richmond, CA
Sponsoring Org.:
USDOE
OSTI Identifier:
896385
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
15 GEOTHERMAL ENERGY; AVAILABILITY; CAPACITY; DEMONSTRATION PLANTS; GEOTHERMAL FIELDS; GEOTHERMAL POWER PLANTS; GEOTHERMAL SYSTEMS; MANAGEMENT; SITE SELECTION; UNINTERRUPTIBLE POWER SUPPLIES; WATER; Geothermal Legacy

Citation Formats

. Review of potential EGS sites and possible EGS demonstration scenarios. United States: N. p., 1999. Web. doi:10.2172/896385.
. Review of potential EGS sites and possible EGS demonstration scenarios. United States. https://doi.org/10.2172/896385
. 1999. "Review of potential EGS sites and possible EGS demonstration scenarios". United States. https://doi.org/10.2172/896385. https://www.osti.gov/servlets/purl/896385.
@article{osti_896385,
title = {Review of potential EGS sites and possible EGS demonstration scenarios},
author = {},
abstractNote = {Review of potential sites for Enhanced Geothermal Systems (EGS) and development of reference scenarios for EGS demonstration projects are two sub-tasks included in the FY 1999 EGS Research and Development (R&D) Management Task (DOE Task Order Number DE-AT07-99ID60365, included in the Appendix of this report). These sub-tasks are consistent with the EGS Strategic Plan, which includes milestones relating to EGS site selection (Milestone 4, to be completed in 2004) and development of a cost-shared, pilot-scale demonstration project (Milestone 5, to be completed in 2008). The purpose of the present work is to provide some reference points for discussing what type of EGS projects might be undertaken, where they might be located, and what the associated benefits are likely to be. The review of potential EGS sites is presented in Chapter 2 of this report. It draws upon site-selection criteria (and potential project sites that were identified using those criteria) developed at a mini-workshop held at the April 1998 DOE Geothermal Program Review to discuss EGS R&D issues. The criteria and the sites were the focus of a paper presented at the 4th International Hot Dry Rock Forum in Strasbourg in September 1998 (Sass and Robertson-Tait, 1998). The selection criteria, project sites and possible EGS developments discussed in the workshop and paper are described in more detail herein. Input from geothermal operators is incorporated, and water availability and transmission-line access are emphasized. The reference scenarios for EGS demonstration projects are presented in Chapter 3. Three alternative scenarios are discussed: (1) a stand-alone demonstration plant in an area with no existing geothermal development; (2) a separate generating facility adjacent to an existing geothermal development; and (3) an EGS project that supplies an existing geothermal power plant with additional generating capacity. Furthermore, information potentially useful to DOE in framing solicitations and selecting projects for funding is discussed objectively. Although defined as separate sub-tasks, the EGS site review and reference scenarios are closely related. The incremental approach to EGS development that has recently been adopted could logically be expected to yield proposals for studies that lead up to and include production-enhancement experiments in producing geothermal fields in the very near future. However, the strategic plan clearly calls for the development of a more comprehensive demonstration project that can generate up to perhaps 10 MW (gross). It is anticipated that a series of small-scale experiments will define what realistically may be achieved in the near future, thus setting the stage for a successful pilot demonstration. This report continues the process of presenting information on EGS sites and experiments, and begins the process of defining what a demonstration project might be.},
doi = {10.2172/896385},
url = {https://www.osti.gov/biblio/896385}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Sep 01 00:00:00 EDT 1999},
month = {Wed Sep 01 00:00:00 EDT 1999}
}