Interim Stabilization Equipment Essential and Support Drawing Plan
Abstract
This supporting document provides a list of the Essential and Support drawings for the Interim Stabilization project equipment.
- Authors:
- Publication Date:
- Research Org.:
- CH2M Hill Hanford Group, Inc., Richland, WA (United States)
- Sponsoring Org.:
- ENVIRONMENTAL MANAGEMENT (US)
- OSTI Identifier:
- 801110
- Report Number(s):
- HNF-4184, Rev.4
TRN: US0300076
- DOE Contract Number:
- AC06-96RL13200
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 14 Jan 2000
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; STABILIZATION; PLANNING; RADIOACTIVE WASTES; ENGINEERING DRAWINGS; MATERIALS HANDLING EQUIPMENT; RADIOACTIVE WASTE PROCESSING
Citation Formats
KOCH, M R. Interim Stabilization Equipment Essential and Support Drawing Plan. United States: N. p., 2000.
Web. doi:10.2172/801110.
KOCH, M R. Interim Stabilization Equipment Essential and Support Drawing Plan. United States. https://doi.org/10.2172/801110
KOCH, M R. 2000.
"Interim Stabilization Equipment Essential and Support Drawing Plan". United States. https://doi.org/10.2172/801110. https://www.osti.gov/servlets/purl/801110.
@article{osti_801110,
title = {Interim Stabilization Equipment Essential and Support Drawing Plan},
author = {KOCH, M R},
abstractNote = {This supporting document provides a list of the Essential and Support drawings for the Interim Stabilization project equipment.},
doi = {10.2172/801110},
url = {https://www.osti.gov/biblio/801110},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Jan 14 00:00:00 EST 2000},
month = {Fri Jan 14 00:00:00 EST 2000}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.