skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: THE TWO STAGE CRYSTAL COLLIMATOR FOR RHIC.

Conference ·
OSTI ID:785045

The use of a two stage crystal collimation system in the RHIC yellow ring is examined. The system includes a copper beam scraper and a bent silicon crystal. While scrapers were installed in both of the RHIC rings before the year 2000 run, the crystal is installed for the 2001 run in one ring only, forming a two stage collimation system there. We present simulations of the expected channeling through the bent silicon crystal for both protons and gold ions with various beam parameters. This gives a picture of the particle losses around the ring, and the expected channeling efficiency. These results are then used to optimize the beam parameters in the area of the crystal to obtain maximum channeling efficiency, minimize out-scattering in the secondary collimator, and reduce beam halo.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC02-98CH10886
OSTI ID:
785045
Report Number(s):
BNL-67967; KA0201; R&D Project: AD002ADOP; KA0201; TRN: US0108327
Resource Relation:
Conference: PARTICLE ACCELERATOR CONFERENCE 2001, CHICAGO, IL (US), 06/18/2001--06/22/2001; Other Information: PBD: 18 Jun 2001
Country of Publication:
United States
Language:
English

Similar Records

CRYSTAL COLLIMATION AT RHIC.
Conference · Sun Jun 02 00:00:00 EDT 2002 · OSTI ID:785045

NEW RESULTS FROM CRYSTAL COLLIMATION AT RHIC.
Conference · Mon May 12 00:00:00 EDT 2003 · OSTI ID:785045

CRYSTAL COLLIMATION AT RHIC.
Conference · Thu Jun 19 00:00:00 EDT 2003 · OSTI ID:785045