Title: Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming

Technical Report ·
DOI:https://doi.org/10.2172/6401184· OSTI ID:6401184

The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

Research Organization:
USDOE Western Area Power Administration, Loveland, CO (USA). Loveland Area Office
Sponsoring Organization:
DOE/EH
OSTI ID:
6401184
Report Number(s):
DOE/EA-0325; ON: DE91001334
Country of Publication:
United States
Language:
English