skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Standpipe-Bubbler pump level control study: 1E-3862, controlled clearance pump/system model analysis (Task A) W. P. 7373. Engineering memorandum 0190. [LMFBR]

Technical Report ·
DOI:https://doi.org/10.2172/6371638· OSTI ID:6371638

Computer simulation results of the Standpipe-Bubbler pump level control system/controlled clearance pump configuration 1E-3862 are presented. Fluid level control system behavior is presented in graphical form for normal plant loading, unloading, and trip transients, under varying conditions of cover gas mass flow rate, tank impedances, temperature, and flow rates through discharge seal and bearing leakage paths. Satisfactory fluid level control can be attained for this configuration with a Standpipe-Bubbler system.

Research Organization:
General Electric Co., Sunnyvale, CA (USA); Borg-Warner Corp., Los Angeles, CA (USA). Byron Jackson Pump Div.
DOE Contract Number:
AT03-76SF98001
OSTI ID:
6371638
Report Number(s):
DOE/SF/98001-T8; ON: DE81023600
Country of Publication:
United States
Language:
English