One year of operating experience with 70 Getter-Ion pumps
Conference
·
OSTI ID:4870374
The vacuum system for the 30 Bev alternating gradient synchrotron is discussed. The operating and maintenance experience on a system using over seventy getter-ion pumps for one year is discussed. Down-time, component life, technician training, remote control, and operation are emphasized. (auth)
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- US Atomic Energy Commission
- DOE Contract Number:
- AT(30-2)-Gen-16
- NSA Number:
- NSA-16-031741
- OSTI ID:
- 4870374
- Report Number(s):
- BNL-5719
- Resource Relation:
- Conference: Eighth National Vacuum Symposium Combined with the Second International Congress on Vacuum Science and Technology, 1961; Related Information: Also intended for publication in Transactions of the Eighth National Vacuum Symposium Combined with the Second International Congress on Vacuum Science and Technology. Vol. 1, pp. 369-73
- Country of Publication:
- United States
- Language:
- English
Similar Records
A SUBLIMATION PUMP
EXPERIMENTAL PROGRAM REQUIREMENTS FOR A 300 TO 1000-Bev ACCELERATOR. DESIGN STUDY FOR A 300 TO 1000-Bev ACCELERATOR
DESIGN STUDY FOR A 300-1000 BEV ACCELERATOR
Technical Report
·
Thu Sep 20 00:00:00 EDT 1962
·
OSTI ID:4870374
EXPERIMENTAL PROGRAM REQUIREMENTS FOR A 300 TO 1000-Bev ACCELERATOR. DESIGN STUDY FOR A 300 TO 1000-Bev ACCELERATOR
Technical Report
·
Mon Aug 28 00:00:00 EDT 1961
·
OSTI ID:4870374
DESIGN STUDY FOR A 300-1000 BEV ACCELERATOR
Technical Report
·
Mon Aug 28 00:00:00 EDT 1961
·
OSTI ID:4870374