skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Paramount Petroleum: Plant-Wide Energy-Efficiency Assessment Identifies Three Projects

Abstract

The Paramount Petroleum plant-wide energy assessment identified a cost-effective electrical power and heat energy production facility and systems that could benefit from either fuel-burn adjustments or a new drive/control system. This could lead to independence from a local electric utility with much improved reliability, estimated annual energy savings of 1,200,000 kWh of electricity, and estimated annual savings of$4.1 million for energy reduction and other improvements.

Publication Date:
Research Org.:
National Renewable Energy Laboratory (NREL), Golden, CO (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
15004273
Report Number(s):
DOE/GO-102003-1681
DOE Contract Number:  
AC36-99-GO10337
Resource Type:
Program Document
Resource Relation:
Related Information: Petroleum BestPractices Plant-Wide Assessment Case Study
Country of Publication:
United States
Language:
English
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; 42 ENGINEERING; INDUSTRIAL ENERGY EFFICIENCY; CASE STUDY; PLANT-WIDE ASSESSMENT; PARAMOUNT; PETROLEUM; CHP; COMBINED HEAT AND POWER; PROCESS HEATERS; PROCESS HEATING; GAS-FIRED HEATERS; VSDS; VSD; VARIABLE SPEED DRIVES; FANS; MOTORS; FAN MOTORS; DANA TECHNLOGIES; ENERGY NEXUS GROUP; Industry

Citation Formats

. Paramount Petroleum: Plant-Wide Energy-Efficiency Assessment Identifies Three Projects. United States: N. p., 2003. Web.
. Paramount Petroleum: Plant-Wide Energy-Efficiency Assessment Identifies Three Projects. United States.
. 2003. "Paramount Petroleum: Plant-Wide Energy-Efficiency Assessment Identifies Three Projects". United States. https://www.osti.gov/servlets/purl/15004273.
@article{osti_15004273,
title = {Paramount Petroleum: Plant-Wide Energy-Efficiency Assessment Identifies Three Projects},
author = {},
abstractNote = {The Paramount Petroleum plant-wide energy assessment identified a cost-effective electrical power and heat energy production facility and systems that could benefit from either fuel-burn adjustments or a new drive/control system. This could lead to independence from a local electric utility with much improved reliability, estimated annual energy savings of 1,200,000 kWh of electricity, and estimated annual savings of$4.1 million for energy reduction and other improvements.},
doi = {},
url = {https://www.osti.gov/biblio/15004273}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jul 01 00:00:00 EDT 2003},
month = {Tue Jul 01 00:00:00 EDT 2003}
}

Program Document:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item.

Save / Share: