Paramount Petroleum: Plant-Wide Energy-Efficiency Assessment Identifies Three Projects
Abstract
The Paramount Petroleum plant-wide energy assessment identified a cost-effective electrical power and heat energy production facility and systems that could benefit from either fuel-burn adjustments or a new drive/control system. This could lead to independence from a local electric utility with much improved reliability, estimated annual energy savings of 1,200,000 kWh of electricity, and estimated annual savings of$4.1 million for energy reduction and other improvements.
- Publication Date:
- Research Org.:
- National Renewable Energy Laboratory (NREL), Golden, CO (United States)
- Sponsoring Org.:
- USDOE
- OSTI Identifier:
- 15004273
- Report Number(s):
- DOE/GO-102003-1681
- DOE Contract Number:
- AC36-99-GO10337
- Resource Type:
- Program Document
- Resource Relation:
- Related Information: Petroleum BestPractices Plant-Wide Assessment Case Study
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; 42 ENGINEERING; INDUSTRIAL ENERGY EFFICIENCY; CASE STUDY; PLANT-WIDE ASSESSMENT; PARAMOUNT; PETROLEUM; CHP; COMBINED HEAT AND POWER; PROCESS HEATERS; PROCESS HEATING; GAS-FIRED HEATERS; VSDS; VSD; VARIABLE SPEED DRIVES; FANS; MOTORS; FAN MOTORS; DANA TECHNLOGIES; ENERGY NEXUS GROUP; Industry
Citation Formats
. Paramount Petroleum: Plant-Wide Energy-Efficiency Assessment Identifies Three Projects. United States: N. p., 2003.
Web.
. Paramount Petroleum: Plant-Wide Energy-Efficiency Assessment Identifies Three Projects. United States.
. 2003.
"Paramount Petroleum: Plant-Wide Energy-Efficiency Assessment Identifies Three Projects". United States. https://www.osti.gov/servlets/purl/15004273.
@article{osti_15004273,
title = {Paramount Petroleum: Plant-Wide Energy-Efficiency Assessment Identifies Three Projects},
author = {},
abstractNote = {The Paramount Petroleum plant-wide energy assessment identified a cost-effective electrical power and heat energy production facility and systems that could benefit from either fuel-burn adjustments or a new drive/control system. This could lead to independence from a local electric utility with much improved reliability, estimated annual energy savings of 1,200,000 kWh of electricity, and estimated annual savings of$4.1 million for energy reduction and other improvements.},
doi = {},
url = {https://www.osti.gov/biblio/15004273},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jul 01 00:00:00 EDT 2003},
month = {Tue Jul 01 00:00:00 EDT 2003}
}
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item.
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.