Unreviewed Disposal Question Evaluation: Waste Disposal In Engineered Trench #3
Because Engineered Trench #3 (ET#3) will be placed in the location previously designated for Slit Trench #12 (ST#12), Solid Waste Management (SWM) requested that the Savannah River National Laboratory (SRNL) determine if the ST#12 limits could be employed as surrogate disposal limits for ET#3 operations. SRNL documented in this Unreviewed Disposal Question Evaluation (UDQE) that the use of ST#12 limits as surrogates for the new ET#3 disposal unit will provide reasonable assurance that Department of Energy (DOE) 435.1 performance objectives and measures (USDOE, 1999) will be protected. Therefore new ET#3 inventory limits as determined by a Special Analysis (SA) are not required.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- USDOE (United States)
- DOE Contract Number:
- DE-AC09-08SR22470
- OSTI ID:
- 1089500
- Report Number(s):
- SRNL-STI-2013-00393; TRN: US1400063
- Country of Publication:
- United States
- Language:
- English
Similar Records
Unreviewed Disposal Question Evaluation: Waste Disposal in Engineered Trenches 3 and 4
Unreviewed Disposal Question Evaluation: Impact of New Information since 2008 PA on Current Low-Level Solid Waste Operations
UNREVIEWED DISPOSAL QUESTION EVALUATION: CENTER SLIT TRENCHES ONE THROUGH FIVE OPERATIONAL COVERS REANALYSIS
Technical Report
·
Tue Dec 12 00:00:00 EST 2017
·
OSTI ID:1089500
Unreviewed Disposal Question Evaluation: Impact of New Information since 2008 PA on Current Low-Level Solid Waste Operations
Technical Report
·
Mon Oct 06 00:00:00 EDT 2014
·
OSTI ID:1089500
+1 more
UNREVIEWED DISPOSAL QUESTION EVALUATION: CENTER SLIT TRENCHES ONE THROUGH FIVE OPERATIONAL COVERS REANALYSIS
Technical Report
·
Thu May 26 00:00:00 EDT 2011
·
OSTI ID:1089500