skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Options for an 11 GeV RF Beam Separator for the Jefferson Lab CEBAF Upgrade

Conference ·
OSTI ID:1021731

The CEBAF accelerator at Jefferson Lab has had, since first demonstration in 1996, the ability to deliver a 5-pass electron beam to experimental halls (A, B, and C) simultaneously. This capability was provided by a set of three, room temperature 499 MHz rf separators in the 5th pass beamline. The separator was two-rod, TEM mode type resonator, which has a high shunt impedance. The maximum rf power to deflect the 6 GeV beams was about 3.4kW. The 12 GeV baseline design does not preserve the capability of separating the 5th pass, 11 GeV beam for the 3 existing halls. Several options for restoring this capability, including extension of the present room temperature system or a new superconducting design in combination with magnetic systems, are under investigation and are presented.

Research Organization:
Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC05-06OR23177
OSTI ID:
1021731
Report Number(s):
JLAB-ACP-09-1044; DOE/OR/23177-1697; TRN: US1104045
Resource Relation:
Conference: PAC 2009, 4-8 May 2009, Vancouver, British Columbia, Canada
Country of Publication:
United States
Language:
English

Similar Records

CEBAF RF separator system
Conference · Sun Sep 01 00:00:00 EDT 1996 · OSTI ID:1021731

HIGH POWER TEST OF RF SEPARATOR FOR 12 GEV UPGRADE OF CEBAF AT JLAB
Conference · Sun Jul 01 00:00:00 EDT 2012 · OSTI ID:1021731

LLRF System for the CEBAF Separator Upgrade
Conference · Mon Dec 01 00:00:00 EST 2014 · OSTI ID:1021731