skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Engineering task plan and status of 241-S-106 Enraf level gauge wire break

Technical Report ·
DOI:https://doi.org/10.2172/10187719· OSTI ID:10187719

This report discusses the findings of a task team which was formed which identified the need for short-term actions to re-establish tank waste level monitoring and to permanently address wire failure. The failed wire was removed and sent to Pacific Northwest Laboratory (PNL) for analysis. It was determined that the cause of the wire failure was due to chloride ion stress corrosion cracking (SCC) of the 316 stainless steel (SS) wire. Radiation induced breakdown of the polyvinyl chloride (PVC) riser liners is suspected to be the source of the chloride ions.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10187719
Report Number(s):
WHC-SD-WM-ETP-119; ON: DE95001038; BR: 35AF11201/35AF11202
Resource Relation:
Other Information: PBD: Sep 1994
Country of Publication:
United States
Language:
English