Trip report, Battelle Memorial Institute, January 25--26, 1955
W. J. O`Leary and R. R. Herries visited BMI to review the progress of subcontract research on extended surface fuel elements and on the consolidation of thorium powder. 1. Seven electrodes of Horizons` powder have been pressed and satisfactorily arc melted under various conditions. 2. A second lot of 18 to 20 lbs. of Horizons` metal has been received at BMI for melting. 3. Eighteen of the proposed 33 ``half-dollar`` uranium corrosion samples for investigation of higher bonding pressures have been prepared. Ten of these are on test in boiling distilled water. 4. Three ERL fluid-pressure-bonded uranium corrosion samples failed due to sheath rupture after 31-33 days on test; no ``undercutting`` was evident. These samples have shown satisfactory corrosion resistance.
- Research Organization:
- Du Pont de Nemours (E.I.) and Co., Wilmington, DE (United States). Atomic Energy Div.
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC09-76SR00001
- OSTI ID:
- 10181586
- Report Number(s):
- DPW-55-24-2; SR/H-797; ON: DE94018609
- Resource Relation:
- Other Information: PBD: 3 Feb 1955
- Country of Publication:
- United States
- Language:
- English
Similar Records
Trip report, Battelle Memorial Institute, February 7--8, 1955
Trip report, Battelle Memorial Institute, March 8--9, 1955
Related Subjects
36 MATERIALS SCIENCE
HANFORD PRODUCTION REACTORS
FUEL ELEMENTS
FABRICATION
THORIUM
COMPACTING
URANIUM
HOT PRESSING
POWDERS
TESTING
EXTRUSION
CORROSION
TRAVEL
220600
220300
360101
RESEARCH
TEST
TRAINING
PRODUCTION
IRRADIATION
MATERIALS TESTING REACTORS
PREPARATION AND FABRICATION