Title: C Reactor reorificing analysis

Technical Report ·
DOI:https://doi.org/10.2172/10137607· OSTI ID:10137607

during the December 1953 extended outage the process water flow at C Reactor was increased and redistributed to allow reactor operation with a 69 tube enrichment ring in the third lattice unit and with the maximum protection afforded by the trip before boiling operational concept. The redistribution was accomplished by the installation of individual venturi flow meters on approximately 1800 process tubes. Flow and pressure requirements were met by the installation of larger diameter conventional Hanford orifices on about 200 tubes. During the outage, the original Panellit gages were replaced with improved Panellit gages equipped with long vane mercoid switches. The purpose of this memorandum is to review and report the results of the reorificing program and to compare them with predicted behavior.

Research Organization:
Hanford Atomic Products Operation, Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10137607
Report Number(s):
HW-30473; ON: DE93009978
Resource Relation:
Other Information: PBD: 12 Jan 1954
Country of Publication:
United States
Language:
English