Title: Back-up radioiodine removal facilities, Purex. Project proposal, Revision 1

Technical Report ·
DOI:https://doi.org/10.2172/10116779· OSTI ID:10116779

The purpose of this project proposal revision is to request authorization of total project funds for back-up radioiodine removal and additional nitric acid recovery facilities for the Purex Plant. It is proposed to provide new facilities at the Purex Plant for the further removal of radioiodine from the dissolver off gases and for further recovery of nitric acid. The facility design will be based on meeting iodine emission requirements under 1961 goal conditions. It is expected that the facilities will include equipment such as an acid absorber, a caustic scrubber, heat exchangers, process vessels, process piping, jets, jumpers, remote control instrumentation, a continuous iodine monitor, new utility supply and discharge piping, waste disposal facilities, utilities, and other auxiliaries. The new equipment will be housed in a reinforced concrete building and vault which will provide necessary shielding and contamination control. A new vessel will also be installed in the 202-A aqueous-make-up facility. The equipment will be contact maintained. Some work will also be performed for tie-ins and alternations to existing facilities. The new iodine removal facilities are desired as early as practical since the effect of iodine emission on the environs surrounding HAPO is more serious during the winter months.

Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10116779
Report Number(s):
HW-40730-Del.; ON: DE92006569
Resource Relation:
Other Information: PBD: 3 Jan 1956
Country of Publication:
United States
Language:
English