Title: Special requirements CG-791 tie-in B, D, DR, and F reactors

Technical Report ·
DOI:https://doi.org/10.2172/10108374· OSTI ID:10108374

This memorandum discusses coupling of the reactor exhaust system to the filter building, under Project CG-791, which will require diversion of the 105 Building exhaust air to two temporary stacks. The temporary stacks will be installed over each of two exhaust fans. The use of these temporary (short) stacks during the tie-in period (estimated at 8 to 16 days) could greatly aggravate radiological problems because of reduced dilution and of the reactor building exhaust air. Special operating requirements are given.

Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10108374
Report Number(s):
HW-65625; ON: DE93003944
Resource Relation:
Other Information: PBD: 13 Jun 1960