Special requirements CG-791 tie-in B, D, DR, and F reactors
This memorandum discusses coupling of the reactor exhaust system to the filter building, under Project CG-791, which will require diversion of the 105 Building exhaust air to two temporary stacks. The temporary stacks will be installed over each of two exhaust fans. The use of these temporary (short) stacks during the tie-in period (estimated at 8 to 16 days) could greatly aggravate radiological problems because of reduced dilution and of the reactor building exhaust air. Special operating requirements are given.
- Research Organization:
- General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 10108374
- Report Number(s):
- HW-65625; ON: DE93003944
- Resource Relation:
- Other Information: PBD: 13 Jun 1960
- Country of Publication:
- United States
- Language:
- English
Similar Records
Decommissioning of Active Ventilation Systems in a Nuclear R and D Facility to Prepare for Building Demolition (Whiteshell Laboratories Decommissioning Project, Canada) - 13073
Flow test: CG-482 ``DR type`` rear pigtail with B, D, DR and F pile fittings
B, D, F, DR, H reactor new aluminum HCR concept: Temperature study
Conference
·
Mon Jul 01 00:00:00 EDT 2013
·
OSTI ID:10108374
+1 more
Flow test: CG-482 ``DR type`` rear pigtail with B, D, DR and F pile fittings
Technical Report
·
Fri May 25 00:00:00 EDT 1956
·
OSTI ID:10108374
B, D, F, DR, H reactor new aluminum HCR concept: Temperature study
Technical Report
·
Tue Jul 28 00:00:00 EDT 1964
·
OSTI ID:10108374